Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD08-01106
StatusFinaled
Name VERTICAL CONSTRUCTION
Site Address 3430 S TK AVE
Project NameCAMP BOW WOW
Customer Number 
ePlanReviewNo
Description
(CAMP BOW WOW) To complete interior demolition work and remodel for the new tenant. All demolition work per demolition plan and to include: patch and repair existing walls, doors,and columns as required. Remove existing floor finishes, clean and repair for new. New work to include: construct new interior walls for office areas, lobby, utility, reception area, and prep. areas. Install kennels for indoor dog day care/boarding facility with chain link fencing and gates. Install kennels for outdoor dog day care/boarding facility with fencing and gates. New electrical work, mechanical work, doggy online cameras, ceiling work, new flooring, and install three new mechanical roof top units. Accessible bathrooms are existing and no structural work is proposed. A new cerificate of occupancy with the new occupant load total is to be issued when completed and approved. This building was originally constructed in Ada county and later annexed into Boise city. The existing envelope is not being affected by this permit. NOTE: this building is not fire sprinklered. All work per approved plans, plan review comments, engineering and CZC08-00092. *SRZ*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection10/9/200810/9/200810/9/2008PPASS
DetailsForrest France
Previous C/N items are finished, noted three exit signs at the east side above doors leading into outside pen enclosures to be removed per review comments and plan revision prior to structural final inspection as agreed.
BLD-Final10/8/200810/9/200810/9/2008PPASS
DetailsJim Storey
JOHN NOTE; CAMP BOW Phone #: ###-####final ok
FIRE-Final Inspection10/3/200810/6/200810/6/2008AFAIL
DetailsTroy Cobbley
Need the project related fire alarm permit finaled. I did note that the keyed hardware out of the northwest corner of the business needs single action hardware installed. The exit signs and emergency lights tested ok. The fire extinguishers were being placed as I left and position as shown on the plans will need to be verified.
BLD-Final10/3/200810/6/200810/6/2008PCANC
DetailsJim Storey
John Phone #: ###-####
BLD-Other9/26/20089/29/20089/29/2008APASS
DetailsJim Storey
john Note: ceiling grid cat bowing Phone #: ###-####
BLD-Conference9/3/20089/3/20089/4/2008PPASS
DetailsJim Storey
john Phone #: ###-####
BLD-Framing/Rough-in8/27/20088/28/20088/28/2008APASS
DetailsJim Storey
john Phone #: ###-####