BLD-Final | 7/11/2008 | 7/14/2008 | 7/14/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/11/2008 at 10:22:53 AM. Contact: ###-####. ok for perm occ
|
FIRE-Alarm Testing | 7/11/2008 | 7/14/2008 | 7/14/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | FAIL |
Forrest France
|
|
|
C/N items are complete with the exception of data cable run in the plenum without a raceway, conduit or plenum rating-see on site correction notice issued per J. Schmer electrical division.
|
BLD-Final | 7/1/2008 | 7/2/2008 | 7/2/2008 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/1/2008 at 9:58:31 AM. Contact: ###-####.
|
BLD-Final | 7/1/2008 | 7/1/2008 | 7/1/2008 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/1/2008 at 9:58:31 AM. Contact: ###-####.
|
FIRE-Alarm Testing | 7/1/2008 | 7/1/2008 | 7/1/2008 | P | DONE |
Forrest France
|
|
|
Duplicate inspection request.
|
FIRE-Conference | 6/30/2008 | 7/1/2008 | 7/1/2008 | A | FAIL |
Forrest France
|
|
|
Need to repair two EM lights, exit door hardware at the east side exit is not approved, project related fire sprinkler permit needs to be requested for final, one PFE at the kitchen installed while on site, need to resolve plenum rated data cable issue.
|
BLD-Wall cover | 6/11/2008 | 6/12/2008 | 6/13/2008 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/11/2008 at 1:56:09 PM. Contact: ###-####.
|
BLD-Other | 6/13/2008 | 6/13/2008 | 6/13/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/11/2008 at 1:56:09 PM. Contact: ###-####.ceiling grid need to get other trades above grid oked also needs to clip or place spreader bars at ends
|
BLD-Framing/Rough-in | 5/29/2008 | 5/30/2008 | 5/30/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/29/2008 at 2:02:18 PM. Contact: ###-####. ok to cover walls after elec r/i is completed
|