Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD08-01168
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 400 N BENJAMIN LN
Project Name 
Customer Number 
ePlanReviewNo
Description
(ADA COUNTY BENJAMIN CAMPUS - PHASE I) To remodel an existing 89,534 square foot wharehouse/office building in phases. Phase I will include 41,700 square feet of the east side of the building. Work to include: [installation of new non-bearing interior partition walls to create, two accessible restrooms on the first floor (four stalls in the womens and two stalls w/ two urinals in the mens room), two accessible restrooms on the second floor (five stalls in the womens and three stalls w/ two urinals in the mens), separate sex accessible U/A rooms, elections area, two training room, open office area, meeting room, five new offices, five group rooms, two break rooms,] new three hour wall extension, new lighting, new plumbing, new doors in specified locations, new exit stairs (not enclosed), installation of suspended ceiling system, installation of new mechanical system (grilles, diffusers, ductwork, and new units), miscellaneous related interior finishes, demo of existing metal lean to at the back of the building and accessible parking w/curb cuts at the front of the building. This building is fully fire sprinklerd any alterations to the sprinkler system shall be maintained per NFPA #13 as regulated by the fire department. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. A separate permit is required if any racks over eight feet are installed. This phase will be given a Temporary Certificate of Occupancy until phase II is completed then a Certificate of Occupancy will be issued to the entire building.**TLW**PLAN MODIFICATION 12-17-08 - Modification submitted to add another egress stair for convienence into hallway A134. The addition of this stairway will improve the ease of access to the second level of Phase I of the ADA county Campus building, it is not required for any code provisions.**TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/9/20096/10/20096/10/2009APASS
DetailsMike Jordan
Jerry Phone #: ###-####.. All issues resolved. Ok for perm occ.
BLD-Final12/15/200812/16/200812/16/2008APART
DetailsMike Jordan
jerry Phone #: ###-####. ok for temp occ. Will be ok for perm occ once phase 2 has been completed and passed.
FIRE-Final Inspection12/15/200812/15/200812/15/2008PPART
DetailsTroy Cobbley
A temporary occupancy was given as per the project scope of work until the phase II of the project is complete.
FIRE-Final Inspection12/11/200812/12/200812/12/2008PFAIL
DetailsTroy Cobbley
Provide missing emergency lighting/exit signs as marked on the plans and relocate the occupant load signs as discussed.
BLD-Other12/11/200812/11/200812/11/2008PPASS
DetailsMike Jordan
jerry Note: rebar Phone #: ###-####. Column pad footings for new partition wall and for post and beam assembly for removal of bearing wall.
FIRE-Alarm Testing12/11/200812/11/200812/11/2008PCANC
DetailsTroy Cobbley
jerry Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
FIRE-Final Inspection12/3/200812/4/200812/4/2008PCANC
DetailsTroy Cobbley
Not ready for a life safety final
BLD-Other11/17/200811/18/200811/18/2008APASS
DetailsMike Jordan
jerry - ceiling grid cover - after 10:00 please Phone #: ###-####. Ceiling grid, 1st. floor ok.
BLD-Other11/12/200811/12/200811/12/2008PPASS
DetailsMike Jordan
Ceiling grid, 2nd. floor only. ok
BLD-Other11/11/200811/12/200811/12/2008ADEFR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/11/2008 at 3:11:32 PM. Contact: ###-####.
FIRE-Supply Line Cover11/10/200811/10/200811/10/2008PPASS
DetailsTroy Cobbley
This inspection was for the covering of the sprinkler piping on the second floor. This piping can be covered.
BLD-Other11/6/200811/6/200811/6/2008PPART
DetailsMike Jordan
jerry Note: ceiling Phone #: ###-####. Ceiling grid, 1st. floor, area at warehouse were new was aded to existing. New portion installed as existing was installed.
FIRE-Conference11/3/200811/3/200811/3/2008PDONE
DetailsTroy Cobbley
jerry Phone #: ###-####
BLD-Other10/30/200810/31/200810/31/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/30/2008 at 12:55:15 PM. Contact: ###-####. Masonry wing wall and added parapet at 3hr. wall location. Also reviewed special insp. reports. Also recieved and submitted calcs from architect for 3hr. hallow core precast panel.
BLD-Framing/Rough-in10/30/200810/31/200810/31/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/30/2008 at 12:54:35 PM. Contact: ###-####. Framing for added stairway. Plan mod has been submitted to city per contractor.
BLD-Footing10/22/200810/22/200810/22/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/22/2008 at 6:44:56 AM. Contact: ###-####. Stemwalls and column pedestals for new canopy on north side of bldg.
BLD-Foundation10/20/200810/21/200810/21/2008APART
DetailsMike Jordan
jerry Note: rebar Phone #: ###-####. Column pad footings and footings for new canopy at north side of bldg. Special insp. on site.
BLD-Conference10/17/200810/20/200810/20/2008ADONE
DetailsMike Jordan
jerry Note: for t-bar Phone #: ###-####
BLD-Framing/Rough-in9/26/20089/26/20089/26/2008PPART
DetailsMike Jordan
jerry Phone #: ###-####. Hardlids in restrooms, 2nd floor.
BLD-Framing/Rough-in9/25/20089/25/20089/25/2008PNR
DetailsMike Jordan
No framing insp done. ESC issues were not resolved from last insp. see esc permit.
BLD-Framing/Rough-in9/25/20089/25/20089/25/2008PPASS
DetailsMike Jordan
jerry Phone #: ###-####
BLD-Framing/Rough-in9/16/20089/17/20089/17/2008APART
DetailsMike Jordan
jerry Phone #: ###-####. 1st. floor interior framed walls only. No grid or hardlids. Also gave contrctor c/n to have architect provide a listed aproved assembly for 3hr. exterior loading dock wall. Existing wall is hallow core precast conc. wall. Assembly submitted was for a solid conc. wall.
BLD-Framing/Rough-in8/29/20088/29/20088/29/2008ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/29/2008 at 6:59:16 AM. Contact: ###-####.
BLD-Framing/Rough-in8/18/20088/19/20088/19/2008APART
DetailsMike Jordan
jerry Phone #: ###-####. interior framed walls only, 2nd floor. No grid or hardlids.
BLD-Framing/Rough-in8/8/20088/11/20088/11/2008ANR
DetailsMike Jordan
Jerry Phone #: ###-####. Needs ri insp. from other trades first.
BLD-Framing/Rough-in8/4/20088/5/20088/5/2008APART
DetailsMike Jordan
Jerry Phone #: ###-####. Framing for new open stairway from existing mezz. ok. to rock and install handrails.