BLD-Aging Inspection | 5/18/2009 | 5/18/2009 | 5/18/2009 | | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 5/18/2009 | 5/18/2009 | 5/18/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 2/27/2009 | 2/27/2009 | 3/2/2009 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 9/22/2008 | 9/23/2008 | 9/23/2008 | A | PASS |
Jim Storey
|
|
|
andy Phone #: ###-#### l/c
|
BLD-Grading Inspection | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | FAIL |
Dave Hannah
|
|
|
needs to lower sinks landing outside of backdoor
|
FIRE-Final Inspection | 9/17/2008 | 9/17/2008 | 9/18/2008 | P | PASS |
Forrest France
|
|
|
C/N is completed with the exception of the landing at the south exit-to be finished prior to structural final, hardware at the interveining door changed to passage, life safety passed.
|
BLD-Final | 9/17/2008 | 9/18/2008 | 9/18/2008 | A | NR |
Dave Hannah
|
|
|
andy Phone #: ###-#### needs other trades to final first
|
FIRE-Final Inspection | 9/16/2008 | 9/16/2008 | 9/16/2008 | P | FAIL |
Forrest France
|
|
|
Need to post building address numbers, missing max. occupant load sign per review notes, threshold at the south exit discharge is not yet finished, door hardware at the intervening space does not comply with IFC 2006 1014.2 (2.) (3.).
|
BLD-Energy code compliance | 8/8/2008 | 8/11/2008 | 8/11/2008 | A | PASS |
Jim Storey
|
|
|
vic Phone #: ###-####
|
BLD-Framing/Rough-in | 8/8/2008 | 8/11/2008 | 8/11/2008 | A | PASS |
Jim Storey
|
|
|
vic Phone #: ###-####
|
BLD-Conference | 8/1/2008 | 8/1/2008 | 8/1/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/1/2008 at 10:01:50 AM. Contact: ###-####. first layer of ceilling assembly ok for cover.
|
BLD-Conference | 7/18/2008 | 7/21/2008 | 7/21/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/18/2008 at 2:09:10 PM. Contact: ###-####. reviewed 2 hr ceilling aplacation.
|