Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-01196
StatusFinaled
Name HIGHMARK CONSTRUCTION
Site Address 2032 S CRYSTAL WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
(7-10-2008 permit is modified to reflect the change of roof trusses to extend to allow for a 121s.f.covered patio. added value for project is to be$1815.00 7-10-2008 pep) " 6/24/08 THIS PROJECT IS MODIFIED TO ALLOW FOR THE USE OF A SLAB ON GRADE T YPE FLOOR FOR THIS REMODEL ADDITION AS SUBJECT TO CONTRACTOR AND OWNER APPROVALS. 6/24/2008 PEPThis project is for the addition of 870s.f. to an existing 1532s.f. 1-story single family dwelling. The addition will be a 210s.f. of bathroom addition to create a new master suite and 660 s.f. of family room area on the other side of the dwelling behind the 528s.f. attached 2-car garage. R-1C ok per Colleen Carroll. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked; Energy option sheet and the plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/29/200812/29/200812/29/2008PPASS
DetailsJim Storey
Roddy- call prior to going for access Phone #: ###-####
DOC - Permit Finaled12/29/200812/29/200812/29/2008PPASS
DetailsJim Storey
BLD-Final12/18/200812/19/200812/19/2008ADEFR
DetailsJim Storey
RODDY NOTE: PLEASE CALL 15 MIN PRIOR TO INSPECTION TO GET IN Phone #: ###-#### mech insp disp. nh?
BLD-Final12/18/200812/18/200812/18/2008PDEFR
DetailsJim Storey
RODDY NOTE: PLEASE CALL 15 MIN PRIOR TO INSPECTION TO GET IN Phone #: ###-#### pending mech.
BLD-Final12/10/200812/11/200812/11/2008ANR
DetailsJim Storey
roddy - please call 15 minutes prior Phone #: ###-#### need hvac final.
BLD-Energy code compliance8/22/20088/25/20088/25/2008APASS
DetailsJim Storey
Roddy Phone #: ###-####
BLD-Framing/Rough-in8/20/20088/21/20088/21/2008APASS
DetailsJim Storey
Roddy Phone #: ###-####
BLD-Framing/Rough-in7/10/20087/11/20087/11/2008ANR
DetailsJim Storey
Tom Phone #: ###-####
BLD-Foundation7/11/20087/11/20087/11/2008APASS
DetailsJim Storey
Tom Phone #: ###-####
BLD-Footing7/8/20087/9/20087/9/2008APASS
DetailsJim Storey
Tom Phone #: ###-####