Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD08-01210
StatusFinaled
Name ESI
Site Address 1072 N LIBERTY ST
Project NameST ALPHONSUS-MOB #7
Customer Number 
ePlanReviewNo
Description
St. Alphonsus - MOB VII shell & core building - To construct a new 70,705 square foot, three story, steel frame and concrete medical office shell and core building related site improvements. The core areas include stair enclosures, elevators, mechanical and electrical rooms and entry lobby. This building is fully fire sprinkled. The sprinklers are used for area increase. Any I-2 Occupancies would be limited to the first floor and must be separated from the remainder of the building by minimum one-hour fire-barriers. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/28/20095/29/20095/29/2009PPASS
DetailsTom Arcoraci
DOC - Permit Finaled5/29/20095/29/20095/29/2009PPASS
DetailsTom Arcoraci
BLD-Final5/28/20095/29/20095/29/2009APART
DetailsTom Arcoraci
Adam Phone #: ###-####
FIRE-Final Inspection5/28/20095/29/20095/29/2009APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection5/26/20095/26/20095/26/2009PPART
DetailsTroy Cobbley
A temporary occupancy is being given until 5/29/2009 with Jason Blaise, Mark Sentenno and Scott Areleno's permission. The Area of Refuge equipment needs to be installed and tested. The address has been changed from a Hartman street address to Liberty Street.
BLD-Final5/22/20095/26/20095/26/2009APART
DetailsJim Storey
adam - late morning please Phone #: ###-#### temp l/c isued. pending equment instal verifaction in area of refuse.
FIRE-Final Inspection5/21/20095/21/20095/21/2009PFAIL
DetailsTroy Cobbley
Provide a letter from plan review stating that the exit sign on the roof can be deleted. Provide and test all items pertaining to the Area of Refuge. Provide testing of the elevator and fire alarm interconnections. The building address does not match the address the central station give to the boise fire dept. This will have to have approval.
BLD-Conference5/21/20095/21/20095/21/2009PPASS
DetailsTom Arcoraci
needs com and sign at area of refuge
FIRE-Final Inspection5/19/20095/20/20095/20/2009PFAIL
DetailsTroy Cobbley
The project related fire alarm and fire sprinkler permits need to be finaled. Also the Area of Refuge items as listed on the fire and building review comments have not been addressed. One exit sign needs to be added on the roof stair entrance.
BLD-Conference5/19/20095/19/20095/19/2009PPASS
DetailsTom Arcoraci
BLD-Conference5/15/20095/15/20095/15/2009PPASS
DetailsTom Arcoraci
BLD-Conference5/13/20095/13/20095/13/2009PPASS
DetailsTom Arcoraci
BLD-Conference5/12/20095/13/20095/13/2009APASS
DetailsTom Arcoraci
BLD-Framing/Rough-in5/7/20095/7/20095/7/2009PPASS
DetailsTom Arcoraci
Ceiling inspection please-- Dale Phone #: ###-####
BLD-Other5/6/20095/7/20095/7/2009APASS
DetailsTom Arcoraci
BLD-Other5/6/20095/6/20095/6/2009PCANC
DetailsTom Arcoraci
BLD-Conference5/5/20095/6/20095/6/2009APASS
DetailsTom Arcoraci
BLD-Conference5/5/20095/5/20095/5/2009PPASS
DetailsTom Arcoraci
FIRE-Final Inspection4/28/20094/29/20094/29/2009AFAIL
DetailsTroy Cobbley
This was actually a conference for the placement of the exterior electric alarm bell. Per mark sentenno the bell can be placed on the glass wall above the fdc or 15'-0" to the west, above the glass panels, in the rock wall.
BLD-Conference4/28/20094/29/20094/29/2009PPASS
DetailsTom Arcoraci
BLD-Conference4/27/20094/29/20094/28/2009ACANC
DetailsTom Arcoraci
BLD-Conference4/24/20094/24/20094/24/2009PPASS
DetailsTom Arcoraci
BLD-Conference4/23/20094/23/20094/24/2009PPASS
DetailsTom Arcoraci
FIRE-Conference4/2/20094/2/20094/2/2009PDONE
DetailsTroy Cobbley
Dale and I went over fire extinguisher placement and placement of the knox key box.
BLD-Framing/Rough-in3/23/20093/24/20093/24/2009APASS
DetailsTom Arcoraci
Dale Phone #: ###-#### wip ok
BLD-Framing/Rough-in3/6/20093/9/20093/10/2009PPASS
DetailsTom Arcoraci
adam - ceiling grid Phone #: ###-####
BLD-Wall cover3/3/20093/3/20093/3/2009PPART
DetailsTom Arcoraci
BLD-Other2/5/20092/5/20092/5/2009PPASS
DetailsTom Arcoraci
BLD-Other1/26/20091/26/20091/26/2009PPASS
DetailsTom Arcoraci
dale-fire stop inspection Phone #: ###-#### wip ok
BLD-Other1/20/20091/21/20091/21/2009APASS
DetailsTom Arcoraci
dale - fire stop Phone #: ###-####
BLD-Framing/Rough-in1/16/20091/16/20091/16/2009PPART
DetailsTom Arcoraci
dale - partial wall Phone #: ###-####
BLD-Framing/Rough-in1/7/20091/7/20091/7/2009PPASS
DetailsTom Arcoraci
dale Phone #: ###-#### wip ok
BLD-Framing/Rough-in12/16/200812/16/200812/16/2008PNR
DetailsTom Arcoraci
dale wip ok
BLD-Framing/Rough-in12/12/200812/16/200812/16/2008ACANC
DetailsTom Arcoraci
BLD-Framing/Rough-in12/12/200812/12/200812/12/2008PPART
DetailsTom Arcoraci
dale Phone #: ###-#### wip ok
BLD-Conference12/8/200812/11/200812/11/2008APASS
DetailsTom Arcoraci
BLD-Framing/Rough-in12/8/200812/8/200812/8/2008PPART
DetailsTom Arcoraci
dale Phone #: ###-#### par ok wip
BLD-Footing11/4/200811/5/200811/5/2008APASS
DetailsMike Jordan
Dale Phone #: ###-####. #rd floor slab on deck, south half ok. Special insp. has approved also.
BLD-Other10/17/200810/20/200810/20/2008APASS
DetailsJim Storey
dale Note: 1st in morning for structural steel concrete Phone #: ###-#### third floor deck ok 2/3 north to center of deck ok to place concrete. si signed off.
BLD-Concrete9/25/20089/26/20089/26/2008APART
DetailsJim Sly
Ken Phone #: ###-#### - pouring at 12:30
Grade Beams At North and West walls OK pending MTI special insp, tests and approvals.
BLD-Foundation9/22/20089/23/20089/23/2008APART
DetailsMike Jordan
DALE Phone #: ###-####. INterior and exterior column pad footings on grids 4 and 5. Will have special insp.
BLD-Foundation9/18/20089/19/20089/19/2008APART
DetailsMike Jordan
gale - 10:00 pouring concrete Phone #: ###-####
BLD-Foundation9/16/20089/16/20089/16/2008APASS
DetailsJim Storey
Dale Phone #: ###-#### 3dr floor at stair towers ok mti on site ok
BLD-Footing9/9/20089/10/20089/10/2008APART
DetailsJim Sly
dale Phone #: ###-####
North stair tower 2nd floor walls OK pending MTI special insp. tests and approvals.
BLD-Foundation9/3/20089/4/20089/4/2008APART
DetailsJim Sly
dale Phone #: ###-####
Grade beams at East and South wall appear OK........Pending MTI special inspection, tests and approvals.
BLD-Foundation8/29/20088/29/20088/29/2008APART
DetailsMike Jordan
dale- ###-####. INterior column pad footings.
BLD-Footing8/22/20088/25/20088/25/2008APASS
DetailsMike Jordan
dale Phone #: ###-####. Mat footing for north stair tower and mech. room. Also reveiwed all special insp. reports to date.
BLD-Footing8/19/20088/20/20088/20/2008PPART
DetailsMike Jordan
Dale Phone #: ###-####. Column pad footings for grade beams at gridline 1 and h.
BLD-Footing8/18/20088/19/20088/19/2008APART
DetailsJim Storey
Dale- late morning if possible Phone #: ###-#### placed w si
BLD-Foundation8/12/20088/13/20088/13/2008APART
DetailsMike Jordan
dale - after 10:00 please Phone #: ###-####. MAt footing for elevator and stair tower. wip on bottom mat. All soils have been tested and evaluated by MTI (special insp) will also have specail insp on all aspects of const.