BLD-Final | 12/5/2008 | 12/5/2008 | 12/5/2008 | A | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 12/5/2008 | 12/5/2008 | 12/5/2008 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 12/4/2008 | 12/4/2008 | 12/4/2008 | A | PASS |
Forrest France
|
|
|
Corrections field verified for completion, fire life safety passed.
|
FIRE-Final Inspection | 11/26/2008 | 11/28/2008 | 11/28/2008 | A | PART |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory with the exception of automatic smoke/heat vents installed throughout which do not meet exception criteria per IFC in conjunction with ESFR sprinkler systems.
|
BLD-Final | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | NR |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Other | 8/29/2008 | 9/2/2008 | 9/2/2008 | P | PASS |
Jim Storey
|
|
|
Jim- rebar Phone #: ###-#### si on site
|
BLD-Footing | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | PASS |
Jim Storey
|
|
|
jim Phone #: ###-#### ft and pannels east end.
|
BLD-Other | 8/26/2008 | 8/27/2008 | 8/27/2008 | P | PASS |
Jim Storey
|
|
|
jim - rebar for tilt wall Phone #: ###-#### north east wall pannels rebar ok pending si concrete reports.
|
BLD-Footing | 8/25/2008 | 8/26/2008 | 8/26/2008 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
BLD-Footing | 8/25/2008 | 8/25/2008 | 8/25/2008 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### si pending report.
|
BLD-Footing | 8/21/2008 | 8/22/2008 | 8/22/2008 | A | PASS |
Jim Storey
|
|
|
jim - late morning please Phone #: ###-####
|
BLD-Footing | 8/19/2008 | 8/19/2008 | 8/19/2008 | P | PASS |
Jim Storey
|
|
|
jim Phone #: ###-#### sw ft ok
|
BLD-Footing | 8/15/2008 | 8/18/2008 | 8/18/2008 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### west wall panels rebar ok.
|
BLD-Footing | 8/14/2008 | 8/14/2008 | 8/14/2008 | P | PASS |
Jim Storey
|
|
|
jim - re-bar Phone #: ###-#### ft southeast 400 ln ft rebar ok need rfi for sewer pipe thru ft from engineer.
|
BLD-Other | 8/11/2008 | 8/12/2008 | 8/12/2008 | A | PASS |
Jim Storey
|
|
|
jim Note: rebar Phone #: ###-#### south side tilt pannels rebar ok/ si report will verify three #6 bar missed before placment of concrete.
|
BLD-Footing | 7/29/2008 | 7/29/2008 | 7/29/2008 | P | PART |
Jim Storey
|
|
|
jim Phone #: ###-#### ne pad ft si on site rebar ok.
|
BLD-Footing | 7/28/2008 | 7/28/2008 | 7/28/2008 | P | PART |
Jim Storey
|
|
|
jim Note: pour around 1:00 pm Phone #: ###-#### placed with si.
|
BLD-Footing | 7/23/2008 | 7/24/2008 | 7/24/2008 | A | PASS |
Jim Storey
|
|
|
jim - rebar Phone #: ###-#### east/north pad ft rebar ok pending si report
|
BLD-Footing | 7/21/2008 | 7/22/2008 | 7/22/2008 | A | PART |
Jim Storey
|
|
|
Ron Phone #: ###-#### pad ft interior east end ok pending si reports.
|