Permit Information
Permit NumberBLD08-01293
StatusFinaled
Name GUHO CORP
Site Address 404 S 8TH ST
Project Name8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(8TH STREET MARKETPLACE - ATRIUM SMOKE CONTROL - 404 S 8TH STREET) (8-23-13 PLAN MODIFICATION TO INCORPORATE INTO THIS PHASE II PROJECT SOME PHASE I WORK THAT WAS FORMERLY EXPECTED TO BE DONE UNDER PERMIT BLD08-00378 AND SOME PHASE III WORK THAT WAS FORMERLY EXPECTED TO BE DONE UNDER A FUTURE PERMIT. THE SCOPE OF EACH PHASE IS PER A NEW UPGRADE AGREEMENT SIGNED BY CITY PERSONNEL ON JULY 2, 2013. A FUTURE PHASE III PERMIT WILL BE SUBMITTED LATER THAT IS INTENDED TO CREATE A FULLY OPERATIONAL SMOKE MANAGEMENT SYSTEM.) The fire sprinkler system substitutes for the 1-hr fire-resistance-rating of the building. To complete Phase II (construct structural supports for roof top smoke exhaust fans, install roof top smoke exhaust fans, and install associated ductwork) of the atrium smoke control system. Phase I (installed the exhaust grille, constructed the roof curb, and installed the exhaust plenum on top of the roof curb) was done as plan modifications to permit BLD08-00378. Phase III (install automatic unlatching and opening hardware on select doors and windows to provide for make-up air, install a standby diesel powered electrical generator, and install all elements for a complete smoke control system) will be done under a future permit. The work is required to comply with the approved drawings, with the plan review report, with the structural design, with the smoke control design, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  3/4/2014 DONE
DetailsChristina Prado
Per Dave Hannah 3-4-14
BLD-Final2/7/20142/10/20142/10/2014APASS
DetailsDave Hannah
Boyd Phone #: ###-####
FIRE-Final Inspection2/5/20142/5/20142/5/2014PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Aging Inspection11/18/201311/18/201311/25/2013 PEND
DetailsDave Hannah
BLD-Footing11/20/201311/20/201311/21/2013PPASS
DetailsDave Hannah
BOYD Phone #: ###-####
BLD-Aging Inspection3/5/20133/5/20133/13/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection9/21/20129/21/20129/21/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection5/25/20125/25/20125/29/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection2/6/20122/6/20122/9/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection8/12/20118/12/20118/12/2011 PEND
DetailsDave Hannah
BLD-Conference4/4/20114/5/20114/6/2011PDEFR
DetailsDave Hannah
Ken Beck from Guho Construction ###-#### (cell) would like to meet on site at 2:00 pm. Request for permit extension needs to be turned in to Jason Blais.
FIRE-Final Inspection5/28/20106/1/20106/1/2010ANR
DetailsForrest France
Intended by contractor for FIR08-00378- Phase II work per this permit scope is not complete.
Extend Permit 180 days 12/9/20086/8/2009 DONE
Jenifer approved an extension of the permit application to June 8, 2009.