(RED CROSS - FRANKLIN BUSINESS PARK - BLDG 3) To remodel a 4,351 sq.ft. area within an existing 12,200 sq. ft. building for use as office with accessory uses per approved plans. Work includes select demolition of non-bearing walls, doors, glazing & restrooms; upgrade common use restrooms for accessibility compliance; construct interior walls to create offices; add accessible doors and door hardware; modify suspended ceiling grid, electrical, mechanical and plumbing; and dual level light switches for energy code upgrade. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/24/20089/24/20089/24/2008PPASS
DetailsMike Jordan
Curt- call 30 mins prior to going Phone #: ###-####. All issues resolved. ok for perm occ.
BLD-Final9/18/20089/19/20089/19/2008ANR
DetailsMike Jordan
Curt- late am Phone #: ###-####. Needs plumbing final.
FIRE-Final Inspection9/18/20089/19/20089/19/2008APASS
DetailsTroy Cobbley
fire life safety passed
BLD-Final9/17/20089/18/20089/18/2008PNR
DetailsMike Jordan
Curt Phone #: ###-####. Needs plumbing final and life/safety.
FIRE-Final Inspection9/17/20089/18/20089/18/2008AFAIL
DetailsTroy Cobbley
Provide exit signs/emergency lights as discussed and marked on the city approved plans and provide approved door hardware as discussed and shown on the approved plans.
BLD-Framing/Rough-in9/11/20089/12/20089/12/2008APART
DetailsMike Jordan
shane - ceiling grid Phone #: ###-####. Ceiling grid ok. Needs elec. and mech ri insp. prior to cover. Also needs to leave portion of grid out were draftstop and corridor wall still need to be repaired.
BLD-Framing/Rough-in8/27/20088/28/20088/28/2008PPART
DetailsJim Sly
kurt Phone #: ###-#### - please call 1/2 hr prior to inspection
Framing appears OK.......Ok to cover areas not affected by CN.... Fix holes in R-19 ceiling insul, fix draftstop, fix all penitrations in wall adjacent to 1hr corridor, Architect to address new 20 min rated door to be installed in 1hr corridor and how it can meet ADA req. at sides of door.