BLD-Final | 9/24/2008 | 9/24/2008 | 9/24/2008 | P | PASS |
Mike Jordan
|
|
|
Curt- call 30 mins prior to going Phone #: ###-####. All issues resolved. ok for perm occ.
|
BLD-Final | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | NR |
Mike Jordan
|
|
|
Curt- late am Phone #: ###-####. Needs plumbing final.
|
FIRE-Final Inspection | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Troy Cobbley
|
|
|
fire life safety passed
|
BLD-Final | 9/17/2008 | 9/18/2008 | 9/18/2008 | P | NR |
Mike Jordan
|
|
|
Curt Phone #: ###-####. Needs plumbing final and life/safety.
|
FIRE-Final Inspection | 9/17/2008 | 9/18/2008 | 9/18/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide exit signs/emergency lights as discussed and marked on the city approved plans and provide approved door hardware as discussed and shown on the approved plans.
|
BLD-Framing/Rough-in | 9/11/2008 | 9/12/2008 | 9/12/2008 | A | PART |
Mike Jordan
|
|
|
shane - ceiling grid Phone #: ###-####. Ceiling grid ok. Needs elec. and mech ri insp. prior to cover. Also needs to leave portion of grid out were draftstop and corridor wall still need to be repaired.
|
BLD-Framing/Rough-in | 8/27/2008 | 8/28/2008 | 8/28/2008 | P | PART |
Jim Sly
|
|
|
kurt Phone #: ###-#### - please call 1/2 hr prior to inspection Framing appears OK.......Ok to cover areas not affected by CN.... Fix holes in R-19 ceiling insul, fix draftstop, fix all penitrations in wall adjacent to 1hr corridor, Architect to address new 20 min rated door to be installed in 1hr corridor and how it can meet ADA req. at sides of door.
|