BLD-Final | 2/13/2009 | 2/13/2009 | 2/13/2009 | P | PASS |
Dave Hannah
|
|
|
Rory Phone #: ###-#### ok for perm occ
|
BLD-Final | 10/23/2008 | 10/24/2008 | 10/24/2008 | P | PART |
Dave Hannah
|
|
|
rory Phone #: ###-#### ok for temp occ c/n on site
|
FIRE-Final Inspection | 10/23/2008 | 10/24/2008 | 10/24/2008 | A | PASS |
Forrest France
|
|
|
All corrections were made per last inspection. KR//Per Forrest France No Fire Alarm permit required///2-19-09 BAS
|
FIRE-Final Inspection | 10/22/2008 | 10/23/2008 | 10/23/2008 | A | FAIL |
Forrest France
|
|
|
Missing address numbers on the building, exit discharge lighting is not complete, missing one exit sign at the northwest exit door per clouded plan revision, need to repair EM lighting at the main office area, also need to provide means for testing the HVAC duct detectors (ie artificial smoke) for unit shutdown, inspection concluded at this time until repairs are made.
|
BLD-Footing | 8/29/2008 | 8/29/2008 | 8/29/2008 | P | PASS |
Dave Hannah
|
|
|
rory Phone #: ###-####
|
BLD-Footing | 8/25/2008 | 8/25/2008 | 8/25/2008 | P | PART |
Mike Jordan
|
|
|
Eric Phone #: ###-####. Interior column pad footings for new bldg. front.
|
BLD-Energy code compliance | 8/14/2008 | 8/14/2008 | 8/15/2008 | P | PART |
Dave Hannah
|
|
|
STEVE Phone #: ###-#### ok to cover ext walls
|
FIRE-Conference | 8/12/2008 | 8/13/2008 | 8/13/2008 | A | DONE |
Forrest France
|
|
|
On site conference regarding fire code review notes, egress lighting, exit discharge, and HVAC system duct detectors.
|
BLD-Framing/Rough-in | 8/12/2008 | 8/13/2008 | 8/13/2008 | A | PART |
Dave Hannah
|
|
|
rory Phone #: ###-#### ok to cover int walls ok to insulate ext
|
BLD-Conference | 6/20/2008 | 6/20/2008 | 6/20/2008 | A | DONE |
Steven Webb
|
|
|
Informed applicant that an ESC plan will be required, waiver request denied.
|