Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-01370
StatusFinaled
Name SAN CUSTOM HOMES
Site Address 4846 W EMERALD ST
Project NameBosnian Express
Customer Number 
ePlanReviewNo
Description
(BOSNIAN EXPRESS) Permit for an addition of 1,030 square feet to an existing 3,032 square foot tenant space. Addition is under an existing Canopy. Work to include: [Construction of interior non-bearing partition walls to create a new store area under an existing canopy and a lobby area under an existing canopy,] new doors in specified locations, install new H-VAC system to addition including ducts and diffusers, new electrical, and installation of interior finishes in compliance with chapter 8 of the IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. This tenant space contains an existing basement area that is to be used for access to mechanical equipment only, no storage or occupancy allowed for basement area.**TLW** 2-9-10 NO CHANGE IN VALUE PER GC 2-9-10 DLD
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/30/200911/30/200911/30/2009PPASS
DetailsTom Arcoraci
dusanka Phone #: ###-####
FIRE-Final Inspection11/30/200911/30/200911/30/2009PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final11/25/200911/27/200911/27/2009PNR
DetailsJim Sly
DUSANKA Phone #: ###-####
Need OK from CDHD...... and need Final from Fire.
FIRE-Final Inspection11/25/200911/27/200911/27/2009AFAIL
DetailsTroy Cobbley
The exit discharge lights failed to operate when tested.
BLD-Aging Inspection10/2/200910/2/200910/2/2009 PASS
DetailsTom Arcoraci
BLD-Energy code compliance7/30/20097/30/20097/30/2009PPASS
DetailsJim Storey
zuhdiga Phone #: ###-####
BLD-Framing/Rough-in7/2/20097/6/20097/6/2009PPASS
DetailsTom Arcoraci
zudo Phone #: ###-####
BLD-Foundation6/12/20096/12/20096/12/2009PPASS
DetailsTom Arcoraci
BLD-Foundation6/11/20096/11/20096/12/2009PPART
DetailsTom Arcoraci
BLD-Foundation6/9/20096/10/20096/11/2009PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/9/2009 at 5:10:15 PM. Contact: ###-####.
BLD-Footing6/9/20096/10/20096/10/2009ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/9/2009 at 5:09:41 PM. Contact: ###-####.
BLD-Foundation6/8/20096/9/20096/9/2009PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/8/2009 at 11:32:55 AM. Contact: ###-####.
BLD-Footing6/8/20096/9/20096/9/2009ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/8/2009 at 11:32:33 AM. Contact: ###-####. needs to return to plan review
BLD-Footing6/8/20096/8/20096/8/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/8/2009 at 8:12:22 AM. Contact: ###-####. Will reschedule for tommorrow.
BLD-Foundation6/8/20096/9/20096/8/2009ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/8/2009 at 8:13:32 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jun 8 2009 11:30AM.