Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-01464
StatusFinaled
Name ESI
Site Address 800 W IDAHO ST
Project NameTHE MODE BLDG
Customer Number 
ePlanReviewNo
Description
(THE MODE BLDG - SHELL & CORE MODIFICATIONS) PLAN MODIFICATION 9-24-08 - Modification submitted to expand Pie Hole tenant further in to existing lobby. This expansion will result in the Pie Hole tenant space now being approximately 953 square feet. Entire expansion is accessory storage area.**TLW** Permit to remodel core and shell of the MODE Building. Scope of work includes: [1st floor modifications including: infill of existing stair to basement, infilling doors in specified locations, construction of interior non-bearing partition walls to define a 7,810 square foor two story tenant space and add 3 accessible restrooms (a unisex accessible restroom in Pie Hole and separate set accessible restrooms in the Grape Escape),] 2nd floor modifications including: infill of existing atrium (1,500 square feet), construction of interior non-bearing partition walls to define tenant spaces, and perform associated remodel to the shell and core areas per approved plans. The owner has applied for silver LEED certification. (Building shell upon completion of this remodel will be: 1st flr =11,800 sq.ft/2nd = 9,800 sq.ft./3rd flr = 11,800 sq.ft./Basement = 11,800 sq.ft.) NO OCCUPANCY FOR ANY PORTION OF THE BUILDING UNDER THIS PERMIT.**TLW** PLAN MODIFICATION 9-24-08 - Modification submitted to expand Pie Hole tenant further in to existing lobby. This expansion will result in the Pie Hole tenant space now being approximately 953 square feet. Entire expansion is accessory storage area.**TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/6/200811/7/200811/7/2008PPASS
DetailsDave Hannah
von Phone #: ###-####
DOC - Permit Finaled  11/7/2008 DONE
DetailsAlexandra L. DeYoung
Per Dave Final
FIRE-Final Inspection11/5/200811/6/200811/6/2008PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Framing/Rough-in11/5/200811/6/200811/6/2008APASS
DetailsDave Hannah
vaughn - late morning please Phone #: ###-####
BLD-Framing/Rough-in9/2/20089/2/20089/2/2008PPART
DetailsDave Hannah
Von Phone #: ###-#### ok to cover walls for storage and restroom
BLD-Final8/27/20088/28/20088/28/2008APART
DetailsDave Hannah
Von- early am please Phone #: ###-####ok to use the two new restrooms
BLD-Framing/Rough-in8/20/20088/21/20088/22/2008APART
DetailsDave Hannah
VON NOTE: PARTIAL FRAMING EARLY POSSIBLE PLEASE Phone #: ###-####ok to cover restrooms
BLD-Framing/Rough-in8/19/20088/19/20088/20/2008PPART
DetailsDave Hannah
Von Phone #: ###-#### tent sep wall and corr walls on second floor ok to cover
BLD-Final8/14/20088/15/20088/18/2008PPART
DetailsDave Hannah
Von Phone #: ###-####ok to occ the restaurant areas
BLD-Framing/Rough-in8/14/20088/14/20088/15/2008PPART
DetailsDave Hannah
bonn note: after 3:00 please Phone #: ###-#### ceiling framing over restaurants ok