BLD-Final | 11/22/2010 | 11/22/2010 | 11/22/2010 | P | PASS |
Tony Young
|
|
|
Dave Phone #: ###-####
|
DOC - Permit Finaled | 11/22/2010 | 11/22/2010 | 11/22/2010 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Grading Inspection | 10/26/2010 | 10/26/2010 | 10/26/2010 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Final | 8/27/2010 | 8/27/2010 | 8/30/2010 | P | NR |
Mike Jordan
|
|
|
Dave Phone #: ###-####.
|
BLD-Aging Inspection | 8/5/2010 | 8/5/2010 | 8/6/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/4/2010 | 6/4/2010 | 6/7/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/30/2010 | 3/30/2010 | 3/31/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Other | 12/22/2009 | 12/22/2009 | 12/22/2009 | A | PART |
Bob Archibald
|
|
|
Site stabization (ESC) required prior to issuance of final.
|
BLD-Conference | 6/16/2009 | 6/17/2009 | 6/17/2009 | A | PASS |
Tony Young
|
|
|
Follow-up....... t/w vertical construction about this,, they are working on this
|
BLD-Conference | 6/11/2009 | 6/12/2009 | 6/16/2009 | P | CANC |
Jim Sly
|
|
|
follow up on c/n or letter........Unable to complete inspection.....Re-scheduled for Tony.
|
BLD-Conference | 6/11/2009 | 6/11/2009 | 6/11/2009 | P | PART |
Tony Young
|
|
|
W/ 325 and 420,, concerned letter from Mike Simplot about soilage on agacent property,, survey pins staked,, c/n posted on obtaining c of o prior to occupancy,, finishing all permits that are open,, to stabilize soils that are exposed,, Civil matter pending? on p/line issues,, not a matter of building code setbacks
|
BLD-Final | 4/16/2009 | 4/16/2009 | 4/16/2009 | P | NR |
Tony Young
|
|
|
dave Phone #: ###-#### need driveway and hillside signoffs
|
BLD-Final | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | NR |
Tony Young
|
|
|
Dave Phone #: ###-#### need hillside,, trades,, firewall, etc.,, on site walk through
|
BLD-Energy code compliance | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PASS |
Tony Young
|
|
|
dave Phone #: ###-####
|
BLD-Framing/Rough-in | 11/24/2008 | 11/24/2008 | 11/24/2008 | P | PASS |
Tony Young
|
|
|
dave Phone #: ###-####
|
BLD-Other | 10/8/2008 | 10/8/2008 | 10/8/2008 | P | PART |
Dave Hannah
|
|
|
dave Note: SHEAR PANEL - NAILING Phone #: ###-#### ok to cover ext
|
BLD-Footing | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | PART |
Tony Young
|
|
|
zane Phone #: ###-#### retaining wall pier and pony wall ftg and point load, and under slab ftgs ok
|
BLD-Foundation | 8/26/2008 | 8/27/2008 | 8/27/2008 | A | PART |
Tony Young
|
|
|
Ian Phone #: ###-#### wip,, ok
|
BLD-Foundation | 8/20/2008 | 8/21/2008 | 8/21/2008 | A | PART |
Tony Young
|
|
|
een Phone #: ###-#### CURVED WALL OK
|
BLD-Footing | 8/15/2008 | 8/18/2008 | 8/18/2008 | A | PASS |
Tony Young
|
|
|
Ian Phone #: ###-####
|