Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD08-01640
StatusFinaled
Name EPSTEIN CONSTRUCTION INC
Site Address 2390 E FREIGHT ST
Project NameWinco Distribution Center T I
Customer Number 
ePlanReviewNo
Description
Winco Distribution Center - Tenant Improvement - To finish a new 712,555 square foot, one story warehouse and office shell building for occupancy. The cold shell was constructed under permit BLD08-01555. This building will contain a 250,500sq. ft. cooler/freezer warehouse, a 391,095 sq. ft. dry goods warehouse, a 10,990 sq. ft. shift exchange area, a 15,780 sq. ft. battery charging area, a 7,740 sq. ft. maintenance area, 4,290 sq. ft. refrigeration/electrical area, 640 sq. ft. of sprinkler valve rooms, a 24,000 sq. ft. main office area, a 3,760 sq. ft. dry good office and a 3,760 sq. ft. perishable goods office. This building is fully fire sprinkled. The sprinklers are used for unlimited area building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection1/13/20101/13/20101/13/2010PPASS
DetailsForrest France
C/N items completed, fire life safety finaled.
BLD-Final1/5/20101/6/20101/6/2010APASS
DetailsForrest France
Correction items completed, fire life safety final approved.
BLD-Final1/5/20101/5/20101/6/2010PPASS
DetailsJim Storey
final set per angie b.
BLD-Final9/29/20099/29/20099/29/2009PPART
DetailsJim Storey
need to test exit door mag lock control devices that are deactavated for temp occ at this time. pending engineer of record letter of review of all rfi's and si records for complance of design. temp occ. aproved.
FIRE-Final Inspection9/10/20099/15/20099/15/2009APART
DetailsForrest France
George Phone #: ###-####
BLD-Final8/4/20098/5/20098/7/2009APART
DetailsJim Storey
george Phone #: ###-#### temp occ. ok for training of three groups to cert. for fork lift oparation. life saftey in drygoods and office in place and aproved for this use.
BLD-Framing/Rough-in7/23/20097/24/20097/24/2009APART
DetailsJim Storey
j.c. - ceiling grid for cover Phone #: ###-####
BLD-Conference7/22/20097/22/20097/22/2009APASS
DetailsJim Storey
wlked deep freezer/parshiables and exterior site for final review/ waiting for landings in progess exit signage being added to north end of smal freezer in tunal/ fire stopping of ele piping and glazing at machine rm pending instaltion. all other isues ok.
FIRE-Final Inspection6/2/20096/2/20096/3/2009PPART
DetailsForrest France
On site conference regarding fire alarm permit work site inspection schedule and related fire sprinkler system interconnections.
BLD-Energy code compliance5/28/20095/29/20095/29/2009APART
DetailsJim Sly
JC ###-####
Main office....Bldg envelope Energy code....OK.
BLD-Energy code compliance5/27/20095/28/20095/28/2009PNR
DetailsJim Sly
jc Phone #: ###-####.....Re-Sched.....
BLD-Framing/Rough-in5/21/20095/21/20095/21/2009PPART
DetailsJim Storey
CFraming inspection for main office and energy inspection for battery complex please-JC Phone #: ###-#### main office ok to cover pending plm. c/n isued for envlope of produce area.
BLD-Conference5/14/20095/15/20095/15/2009APASS
DetailsJim Storey
10:00 am meetting w/strata to review bolting. waked the job with si rep.
FIRE-Conference5/13/20095/13/20095/13/2009ADONE
DetailsForrest France
On site conference regarding project schedule.
BLD-Energy code compliance5/12/20095/13/20095/13/2009PPASS
DetailsJim Storey
J.C. Phone #: ###-#### office ok to cover walls and hard lids in produce area.
BLD-Framing/Rough-in5/11/20095/12/20095/12/2009APART
DetailsJim Storey
JC- call 30 mins prior to going Phone #: ###-#### ok to insulate
BLD-Energy code compliance4/15/20094/16/20094/16/2009APASS
DetailsJim Storey
j.c. - first thing in the morning please Phone #: ###-#### dry goods office ok
BLD-Framing/Rough-in4/14/20094/15/20094/15/2009APASS
DetailsJim Storey
j.c. Phone #: ###-####