BLD-Final | 3/11/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Mike Jordan
|
|
|
Andy Phone #: ###-####. ok forb perm occ.
|
FIRE-Final Inspection | 2/12/2009 | 2/13/2009 | 2/13/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 2/9/2009 | 2/10/2009 | 2/10/2009 | A | PART |
Mike Jordan
|
|
|
andy Phone #: ###-####. ok for temp occ.
|
BLD-Final | 2/9/2009 | 2/9/2009 | 2/9/2009 | P | CANC |
Mike Jordan
|
|
|
andy Note: check ceiling grid Phone #: ###-####
|
BLD-Other | 2/9/2009 | 2/9/2009 | 2/9/2009 | P | PASS |
Mike Jordan
|
|
|
andy Note: check ceiling grid Phone #: ###-####. Ceiling grid under soffit ok.
|
FIRE-Final Inspection | 2/9/2009 | 2/9/2009 | 2/9/2009 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with sam rogers permission until the remain ceiling tile is installed and the exit discharge light outside of the kitchen door is installed and tested.
|
BLD-Other | 2/6/2009 | 2/6/2009 | 2/9/2009 | A | CANC |
Mike Jordan
|
|
|
Ceiling grid- Andy- ###-####
|
FIRE-Conference | 2/6/2009 | 2/6/2009 | 2/6/2009 | A | DONE |
Troy Cobbley
|
|
|
I went over inspection procedures and order of completion with the superintendant.
|
BLD-Other | 2/4/2009 | 2/4/2009 | 2/4/2009 | P | PART |
Mike Jordan
|
|
|
andy Note: ceiling grid Phone #: ###-####. Needs to rpovide assembly from usg for grid under the soffitts.
|
BLD-Conference | 1/29/2009 | 1/29/2009 | 1/29/2009 | P | PASS |
Jim Storey
|
|
|
andy Phone #: ###-#### reviewed sign off procegers
|
BLD-Energy code compliance | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | CANC |
Mike Jordan
|
|
|
ANDY Phone #: ###-####
|
BLD-Framing/Rough-in | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | PASS |
Mike Jordan
|
|
|
ANDY Phone #: ###-####. Hardlids ok to cover.
|
FIRE-Conference | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | DONE |
Troy Cobbley
|
|
|
The combustible concealed space/vertical shaft at the main entrance is ok to cover.
|
BLD-Energy code compliance | 1/5/2009 | 1/5/2009 | 1/5/2009 | P | CANC |
Mike Jordan
|
|
|
andy Phone #: ###-####
|
BLD-Framing/Rough-in | 1/5/2009 | 1/5/2009 | 1/5/2009 | P | PASS |
Mike Jordan
|
|
|
andy Phone #: ###-####. Backing for ada components installed.
|
BLD-Energy code compliance | 1/2/2009 | 1/5/2009 | 1/5/2009 | A | PASS |
Mike Jordan
|
|
|
andy Phone #: ###-####
|
BLD-Framing/Rough-in | 1/2/2009 | 1/5/2009 | 1/5/2009 | A | PART |
Mike Jordan
|
|
|
andy Phone #: ###-####. All soffits and interior walls and framing for mezz. Needs to provide backing for ada grab bars.
|
BLD-Energy code compliance | 12/16/2008 | 12/17/2008 | 12/17/2008 | A | PART |
Mike Jordan
|
|
|
andy Phone #: ###-####. insul. ok at north exterior wall.
|
BLD-Conference | 12/16/2008 | 12/17/2008 | 12/17/2008 | A | PASS |
Mike Jordan
|
|
|
andy Phone #: ###-####. ok to relocate elec panel in stairway.
|
BLD-Framing/Rough-in | 12/9/2008 | 12/10/2008 | 12/10/2008 | A | PART |
Mike Jordan
|
|
|
andy - partial insulation also Phone #: ###-####. Interior sreel stud framed walls at cooler area and kitchen areas only.
|