DOC - Permit Finaled | | | 10/24/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Final | 10/21/2008 | 10/23/2008 | 10/23/2008 | P | PASS |
Dave Hannah
|
|
|
bryson Phone #: ###-####
|
FIRE-Final Inspection | 10/21/2008 | 10/22/2008 | 10/22/2008 | A | PASS |
Forrest France
|
|
|
Verified items on correction notice are in compliance, fire life safety passed, noted seals at fire doors to be installed prior to structural final.
|
FIRE-Final Inspection | 10/20/2008 | 10/21/2008 | 10/21/2008 | A | FAIL |
Forrest France
|
|
|
Door hardware at the elevator lobby egress needs to be changed, provide means for testing the two duct smoke detection devices for unit shutdown and remote annunciator functionality, remiander of life safety items are satisfactory.
|
BLD-Final | 10/17/2008 | 10/20/2008 | 10/21/2008 | P | PART |
Dave Hannah
|
|
|
don Phone #: ###-#### needs fire finals
|
BLD-Other | 10/3/2008 | 10/6/2008 | 10/6/2008 | A | PART |
Dave Hannah
|
|
|
don Note: ceiling grid Phone #: ###-#### ok to cover ceiling
|
BLD-Conference | 10/1/2008 | 10/2/2008 | 10/2/2008 | A | PASS |
Dave Hannah
|
|
|
Bycen Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | PART |
Tony Young
|
|
|
Brycen Phone #: ###-#### east side of break room ok to cover
|
BLD-Framing/Rough-in | 9/8/2008 | 9/8/2008 | 9/9/2008 | P | PASS |
Dave Hannah
|
|
|
brycen - as soon as possible please Phone #: ###-#### ok to cover corradors ceilings and other int walls after other trades ok
|