Permit Information
Permit NumberBLD08-01664
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 400 N BENJAMIN LN
Project Name 
Customer Number 
ePlanReviewNo
Description
(ADA COUNTY BENJAMIN CAMPUS - PHASE II) To remodel an existing 89,534 square foot wharehouse/office building in phases. Phase I covered 41,700 square feet of the east side of the building and Phase II will cover the remaining 39,377 square feet of the west side of the building. Work to include: [installation of new non-bearing interior partition walls to create, five accessible restrooms on the first floor (ten stalls in the womens, five stalls w/ four urinals in the mens room, and one unisex), two accessible restrooms on the second floor (two stalls in the womens, one stall w/ one urinal in the mens and one unisex), open office area, 36 offices, a DMV lobby area (with 23 counter stations) five group rooms, a large meeting room, employee lounge, and other miscellaneous rooms and spaces], new lighting, new plumbing, new doors in specified locations, installation of suspended ceiling system, installation of new mechanical system (grilles, diffusers, ductwork, and new units), miscellaneous related interior finishes, demo of existing metal lean to at the back of the building and accessible parking w/curb cuts at the front of the building. This building is fully fire sprinklerd any alterations to the sprinkler system shall be maintained per NFPA #13 as regulated by the fire department. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. A separate permit is required if any racks over eight feet are installed. This phase will be given a Temporary Certificate of Occupancy until phase I is completed then a Certificate of Occupancy will be issued to the entire building.**TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/9/20096/10/20096/10/2009APASS
DetailsMike Jordan
jerry - please call 1/2 hr prior Phone #: ###-####. All issues resolved. Ok for perm. occ.
FIRE-Final Inspection6/9/20096/9/20096/10/2009PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final4/1/20094/2/20094/2/2009APART
DetailsMike Jordan
Jerry- late am please Phone #: ###-####. ok for temp occ. Needs to install boots under sinks in unisex restrooms and repair flusher in mens room so that itb is on turning radius side.
BLD-Final4/1/20094/1/20094/1/2009PNR
DetailsMike Jordan
Needs to resolve mech issues for final.
FIRE-Final Inspection3/31/20094/1/20094/1/2009APART
DetailsTroy Cobbley
A temporary occupancy was given with mark senteno's permission until the fire alarm permit is finaled. The temporary is only until April 19th as agreed upon with Stock Construction.
BLD-Final3/31/20094/1/20094/1/2009ANR
DetailsMike Jordan
jerry Phone #: ###-####. Still needs fire/life/safety. Rescheduled for pm inspection.
FIRE-Final Inspection3/30/20093/31/20093/31/2009AFAIL
DetailsTroy Cobbley
The project related fire alarm permit needs to be finaled prior to this inspection. A preliminary inspection was previously provided.
FIRE-Final Inspection3/23/20093/26/20093/26/2009AFAIL
DetailsTroy Cobbley
The project related fire alarm and fire sprinkler permits need to be finaled. Also panic hardware is required to be installed on the conference room door, provide additional emergency lighting in the two adjoining main north facing lobbys. Provide non-locking hardware from the warehouse due to an exit sign over the door or get plan reviewer permission to delete the exit sign. Provide single action hardware on the south exit door from the warehouse.
BLD-Other3/18/20093/18/20093/18/2009PPASS
DetailsJim Storey
Jerry- t bar Phone #: ###-#### dmv ceilling area c/n made ok
BLD-Other3/9/20093/10/20093/10/2009APART
DetailsMike Jordan
Jerry- ceiling Phone #: ###-####. 1st. floor, except for high ceiling at DmV area. Also needs to provide wires on diffusers.
BLD-Framing/Rough-in2/20/20092/20/20092/20/2009PPART
DetailsTom Arcoraci
jerry - ceiling - t-bar Phone #: ###-#### up stairs grid ok
FIRE-Conference2/12/20092/13/20092/13/2009ADONE
DetailsTroy Cobbley
Contractor wanted approval to use a fire retardant on the exposed wood. I deferred him to Tim Frost for approval.
BLD-Conference1/6/20091/6/20091/6/2009PDONE
DetailsMike Jordan
jerry Phone #: ###-####
BLD-Framing/Rough-in12/29/200812/30/200812/30/2008APART
DetailsJim Storey
jerry Phone #: ###-#### 2nd phase ok all but restrooms not ready.
BLD-Framing/Rough-in12/8/200812/8/200812/8/2008PPART
DetailsMike Jordan
eric Phone #: ###-####. INterior steel stud framed walls on 1st. floor and 2nd. floor except for restrom.
BLD-Framing/Rough-in12/2/200812/3/200812/3/2008APART
DetailsMike Jordan
jerry Phone #: ###-####. Elevator shaft framing from 2nd. floor to ceiling.
BLD-Footing11/13/200811/13/200811/13/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/13/2008 at 6:38:04 AM. Contact: ###-####. Footing for elevaror pit.