BLD-Conference | 2/3/2010 | 2/4/2010 | 2/5/2010 | P | PASS |
Jim Sly
|
|
|
Todd ###-#### Complaints from Neighbors adjacent to rearof bldg. Lighting at rear of bldg is shining on residential housing and keeping occupants awake. Worked with Contr and had him install shroud around lights.
|
BLD-Final | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Mike Jordan
|
|
|
Todd Phone #: ###-####. ok for perm occ.
|
BLD-Conference | 2/2/2010 | 2/3/2010 | 2/3/2010 | P | CANC |
Jim Sly
|
|
|
Todd phone ###-#### Re-sched.....
|
BLD-Conference | 2/3/2010 | 2/3/2010 | 2/3/2010 | P | CANC |
Jim Sly
|
|
|
Todd ###-####
|
BLD-Conference | 1/28/2010 | 2/2/2010 | 2/2/2010 | A | CANC |
Jim Sly
|
|
|
Call Todd at ###-#### Check to see if he put a shroud over light at back of bldg. Not done yet...Re-sched.......
|
BLD-Final | 1/27/2010 | 1/28/2010 | 1/28/2010 | A | PART |
Jim Sly
|
|
|
Todd Phone #: ###-#### OK for Temp Occ. Talked to Todd about Zoning on Temp...(Bicycle rack).
|
BLD-Final | 1/26/2010 | 1/26/2010 | 1/26/2010 | P | NR |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Everything ok, Mech failed. Needs to recall insp. once mech has passed.
|
FIRE-Final Inspection | 1/25/2010 | 1/25/2010 | 1/25/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 1/20/2010 | 1/21/2010 | 1/21/2010 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on door 101 and provide verification of the hvac systems velocity for possible duct smoke detector requirements.
|
BLD-Framing/Rough-in | 11/12/2009 | 11/13/2009 | 11/13/2009 | A | PASS |
Mike Jordan
|
|
|
TODD (DRAFT STOP IN FIRE WALL) Phone #: ###-####. Draft stop and nailing on interior side of 1hr. firewall ok.
|
BLD-Energy code compliance | 11/10/2009 | 11/10/2009 | 11/10/2009 | P | PASS |
Mike Jordan
|
|
|
Insul. ok.
|
BLD-Framing/Rough-in | 11/10/2009 | 11/10/2009 | 11/10/2009 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 11/10/2009 | 11/10/2009 | 11/10/2009 | A | CANC |
Mike Jordan
|
|
|
###-#### Todd
|
BLD-Framing/Rough-in | 11/5/2009 | 11/6/2009 | 11/6/2009 | A | PART |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Interior framed walls and hardlid only. Needs to provide truss engineering. Also needs to install draftstop.
|
BLD-Framing/Rough-in | 11/4/2009 | 11/4/2009 | 11/4/2009 | P | PART |
Mike Jordan
|
|
|
Todd-Sheating inspection please Phone #: ###-####. exterior 5/8 typex rock for north wall. ok.
|
BLD-Framing/Rough-in | 11/3/2009 | 11/3/2009 | 11/3/2009 | P | PART |
Mike Jordan
|
|
|
todd Phone #: ###-####. 5/8 type x rock for 1hr.wall at parapet, northwall.
|
BLD-Conference | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | PART |
Jim Storey
|
|
|
todd Phone #: ###-#### exterior ok to cover/ need gyp to roof deck and 30 inches above paripett/ interior gyp needed from ceilling to roof deck/ strapping ok for sheer.
|
BLD-Framing/Rough-in | 10/28/2009 | 10/28/2009 | 10/28/2009 | P | FAIL |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Need new UL from architect on north 1hr extering bearing wall. Engineering showing that shear values will be equivelant with 5/8 typex rock instead of 7/16 ply. Also complete straping.
|
BLD-Foundation | 9/30/2009 | 9/30/2009 | 9/30/2009 | P | PART |
Mike Jordan
|
|
|
jack Phone #: ###-####. wip on installing holddowns. All rebar in place.
|
BLD-Footing | 9/25/2009 | 9/28/2009 | 9/28/2009 | A | PART |
Mike Jordan
|
|
|
Todd Phone #: ###-####. perimeter footings. wip on east footing line. Allother is complete.
|