Permit Information
Permit NumberBLD08-01684
StatusFinaled
Name NOBLE FRAMING INC
Site Address 4401 N GINZEL ST
Project Name 
Customer Number 
ePlanReviewNo
Description
NOTE: This house will require a 13D fire sprinkler system, due to its location, which is in excess of FD access requirements (more than 150' from a fire access roadway (the public street) and more than 1.5 miles/4min response time from a fire station. (Unplated subdivision).A FIRE SPRINKLER PERMIT IS REQUIRED PRIOR TO BEGINNING ANY FIRE SPRINKLER WORK. For the construction of a two story 2780 sq.ft single family dwelling ( first story 1524 sq.ft., second story 1256 sq.ft. ) with 3 bedrooms, 2 1/2 baths and a 941 sq.ft. Attached garage all pr the approved plans, plan review report, any notations and the attached engineering. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and a defensible area shall be maintained. A letter from the applicants geotechnical engineer indicating that the footing sub grade is acceptable must be approved by Public Works prior to scheduling a footing inspection, Call Terry Records at 384-3946. R-1C zoning and setbacks per colleen Carroll. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/27/20094/28/20094/29/2009PPASS
DetailsTony Young
Scott Phone #: ###-####
BLD-Final4/28/20094/29/20094/29/2009APASS
DetailsTony Young
Scott Phone #: ###-####
DOC - Permit Finaled4/29/20094/29/20094/29/2009PPASS
DetailsTony Young
c of o issued
BLD-Final4/21/20094/22/20094/28/2009PNR
DetailsTony Young
Scott Phone #: ###-####
need trades, etc
BLD-Grading Inspection4/24/20094/24/20094/24/2009PDONE
DetailsTerry Records
Final grading and drainage approved
BLD-Wall cover2/3/20092/4/20092/4/2009APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 2/3/2009 at 10:37:56 AM. Contact: ###-####.
energy ok
BLD-Framing/Rough-in1/27/20091/28/20091/28/2009APART
DetailsTony Young
scott Phone #: ###-####ok to insulate,, need to justify how roof is vented or ?,, need shear blocks and nailing on exterior,,
BLD-Foundation10/20/200810/21/200810/21/2008APART
DetailsMike Jordan
ed - wall Phone #: ###-####. wip on stemwalls.
BLD-Footing10/17/200810/17/200810/17/2008PPASS
DetailsTony Young
scott Phone #: ###-####
MAIN LEVEL FTGS OK
BLD-Footing10/10/200810/10/200810/10/2008PPART
DetailsTony Young
mud scheduled between 1:30 & 2 ###-#### Scott
poured,, looks ok,, upper section ftgs
BLD-Foundation9/22/20089/23/20089/23/2008APART
DetailsMike Jordan
BILL Phone #: ###-####. Concrete retaining wall. Also reveiwed aprroved engineering for change in vertical reinforcement to #5 at 7 inch oc. Tall portion if wall did remain with #8 vert. steel as per approved plans.
BLD-Footing9/9/20089/11/20089/11/2008APASS
DetailsJim Storey
ed Phone #: ###-#### back ft for retaining wall ok
BLD-Conference9/10/20089/10/20089/10/2008PPASS
DetailsTony Young
ed Phone #: ###-####
str. eng on site,, verbal ok as built from him,, wip