BLD-Final | 9/23/2009 | 9/24/2009 | 9/24/2009 | A | PASS |
Dave Hannah
|
|
|
zack Phone #: ###-####
|
DOC - Permit Finaled | 9/24/2009 | 9/24/2009 | 9/24/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/10/2009 | 9/14/2009 | 9/14/2009 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/10/2009 at 10:26:41 AM. Contact: ###-####. needs to final mec and elec permits first
|
FIRE-Final Inspection | 7/7/2009 | 7/9/2009 | 7/9/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory pending the two fire extinguishers are posted as discussed at locations indicated per approved plans prior to structural final inspection.
|
BLD-Conference | 5/12/2009 | 5/13/2009 | 5/13/2009 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/12/2009 at 7:52:28 AM. Contact: ###-####.
|
BLD-Wall cover | 2/2/2009 | 2/3/2009 | 2/3/2009 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/2/2009 at 7:44:49 AM. Contact: ###-####.
|
BLD-Wall cover | 11/11/2008 | 11/12/2008 | 11/12/2008 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/11/2008 at 7:28:53 AM. Contact: ###-####.
|
BLD-Foundation | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/11/2008 at 7:28:53 AM. Contact: ###-####.
|
BLD-Wall cover | 11/5/2008 | 11/5/2008 | 11/6/2008 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/5/2008 at 11:07:17 AM.
|
BLD-Footing | 11/6/2008 | 11/6/2008 | 11/6/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/5/2008 at 11:07:17 AM.
|