BLD-Other | 2/9/2010 | 2/9/2010 | 2/9/2010 | A | PASS |
Jim Sly
|
|
|
Inspection to determine that Duplex was built to Townhouse requirements. Two 1hr walls, Laydown parapet, No openings (4' ), Wall protection at property line (eaves) OK. OK to convert to Townhouse.
|
BLD-Final | 5/29/2009 | 5/29/2009 | 5/29/2009 | P | PASS |
Jim Sly
|
|
|
Dennis Phone...........Duplex OK'd ONLY .......Need Permit, Zoning approval, and Record prior to Sale of individual units as townhouses.
|
DOC - Permit Finaled | 5/29/2009 | 5/29/2009 | 5/29/2009 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 5/28/2009 | 5/29/2009 | 5/29/2009 | A | DONE |
Jim Sly
|
|
|
Dennis ###-####
|
DOC - Permit Finaled | 5/29/2009 | 5/29/2009 | 5/29/2009 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 5/28/2009 | 5/28/2009 | 5/28/2009 | P | CANC |
Jim Sly
|
|
|
Dennis phone ###-####.....Re-Sched.......
|
BLD-Final | 5/27/2009 | 5/28/2009 | 5/28/2009 | A | CANC |
Jim Sly
|
|
|
Dennis Phone #: ###-####
|
BLD-Framing/Rough-in | 1/12/2009 | 1/13/2009 | 1/13/2009 | A | PASS |
Jim Sly
|
|
|
dennis Phone #: ###-#### Energy OK
|
BLD-Framing/Rough-in | 10/24/2008 | 10/24/2008 | 10/24/2008 | P | PART |
Jim Sly
|
|
|
dean - party wall Phone #: ###-#### Inside.... 2 1hr walls ok ok to stand...
|
BLD-Framing/Rough-in | 9/17/2008 | 9/17/2008 | 9/17/2008 | P | PART |
Jim Sly
|
|
|
paul - wall inspection Phone #: ###-#### Foundation Wall insp......OK
|
BLD-Footing | 9/10/2008 | 9/10/2008 | 9/10/2008 | P | PASS |
Jim Sly
|
|
|
Paul Phone #: ###-####
|