BLD-Final | 9/24/2008 | 9/26/2008 | 9/26/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/24/2008 at 10:28:21 AM. Contact: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 | A | PASS |
Forrest France
|
|
|
All corrections made per Forrest last inspection. KR
|
BLD-Final | 9/23/2008 | 9/24/2008 | 9/24/2008 | A | NR |
Dave Hannah
|
|
|
bill Phone #: ###-#### needs fire final
|
FIRE-Final Inspection | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | FAIL |
Forrest France
|
|
|
Provide approved hardware at the conference room west exit door, manual thumbturns are not allowed, plans need to be available at next site visit. Fire extinguisher okayed.
|