Permit Information
Permit NumberBLD08-01953
StatusFinaled
Name BAR S CONSTRUCTION LLC
Site Address 4630 W STATE ST
Project NameWELLS FARGO
Customer Number 
ePlanReviewNo
Description
(WELLS FARGO - COLLISTER BRANCH - EXTERIOR REMODEL) (DRH08-00289) Additional structural calculations required in the field to verify the capacity of strap connections. Provide calculations to the Structural Inspector. This building is NOT fire sprinklered. To remodel the exterior of an existing bank building. The floor area will be expanded from about 3,683 square feet (3,263 square feet inside and 420 square feet under the drive-thru roof) to about 4,209 square feet (3,683 square feet existing building and 526 square feet roof addition over a sidewalk). The existing drive-thru roof will be demolished and a new roof constructed, an existing chain link mechanical enclosure at grade will be demolished and a new masonry mechanical enclosure will be constructed, a new roof will be constructed on the Northwest side of the building over a sidewalk, and 2 new rooftop structures will be constructed on top of the existing roof. Work is to include concrete footings, concrete piers, steel columns, wood beams, wood trusses, shear walls, masonry veneer, 3 coat cement stucco system, standing seam metal roofing, and single ply membrane roofing. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection9/10/20109/10/20109/10/2010 DONE
DetailsTony Young
DOC - Permit Finaled9/10/20109/10/20109/10/2010PPASS
DetailsTony Young
BLD-Aging Inspection7/5/20107/5/20107/6/2010 DONE
DetailsTony Young
BLD-Aging Inspection5/3/20105/3/20105/4/2010 PASS
DetailsTony Young
BLD-Final10/8/200910/12/200910/12/2009APASS
DetailsTony Young
John Schafer Phone #: ###-####
FIRE-Final Inspection6/18/20096/19/20096/19/2009APASS
DetailsForrest France
Life safety inspection completed acceptable, no inspection record on site for signature.
BLD-Final6/18/20096/18/20096/18/2009PPART
DetailsTony Young
John please call 1/2 hr before going out Phone #: ###-####. conference on final only, needs zoning final, and f/l/s/ final.
BLD-Framing/Rough-in12/19/200812/19/200812/19/2008PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/19/2008 at 11:01:08 AM. Contact: ###-####.
exterior walls on south and s/east,, fireblock in progress
BLD-Framing/Rough-in12/11/200812/12/200812/12/2008APART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/11/2008 at 12:18:21 PM.
drive through frame roof area and section over existing roof ok
BLD-Footing12/5/200812/5/200812/5/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/5/2008 at 6:50:18 AM. Contact: ###-####.west peirs and south bump out.
BLD-Footing12/2/200812/2/200812/2/2008PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/2/2008 at 6:21:34 AM. Contact: ###-####.
roof cover footings on west ok
BLD-Footing11/26/200812/1/200812/1/2008APART
DetailsTony Young
Scheduled by a contractor via Hello! on 11/26/2008 at 12:27:25 PM. Contact: ###-####.
ftgs for new drive through canopy ok