Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD08-01972
StatusFinaled
Name SLETTEN CONSTRUCTION
Site Address 1105 N 13TH ST
Project NameNORTH JUNIOR HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
North Junior High School - Gymnasium Addition & Remodel - To demo all interior partitions and finishes west of grid line "J" at the basement and 1st floor gym. To remove northeast stairway east of grid line "J" and demo and remove west exterior wall. To construct a new 3,755 sq. ft. addition at the west end of the basement & refinish entire basement to include new elevator, interior ramps, locker rooms, equip. storage, mech. room., class room, weight room, wrestling room and new egress hallways and new west stair enclosure. to construct an new 3,880 sq. ft. first floor addition on the west end of the existing gym to enlarge gym to 10,590 sq. ft. and a new entry vestibule, new restrooms & stair enclosure at west end of gym. There will be a divider wall at the center of the gym to divide the gym into two areas. To also construct a new 825 sq. ft. mechanical mezzanine at the new addition. An elevator is being installed to provide an accessible route to the basement and second floor. The scope of work for this project will also include a sprinkler upgrade. All construction per the approved plans and attached comment list. CUP08-00062 JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/15/200910/15/200910/15/2009PPASS
DetailsTony Young
jerry Phone #: ###-####
BLD-Final10/2/200910/5/200910/5/2009APART
DetailsTony Young
Patrick Phone #: ###-####
BLD-Final10/5/200910/5/200910/5/2009PPART
DetailsTony Young
Jerry; Phone #: ###-####
recieved letter from engineer,, need zoning still,, temp guard rails and handrails on rebuilt steps on exterior,, TEMP occ. still ok
BLD-Final10/2/200910/2/200910/2/2009PPART
DetailsTony Young
Patrick Phone #: ###-####
temp occ ok
FIRE-Final Inspection10/2/200910/2/200910/2/2009APASS
DetailsForrest France
Fire life safety correction items and project related FIR permits verified for compliance, inspection passed.
BLD-Final9/30/200910/1/200910/2/2009PPART
DetailsTony Young
patrick Phone #: ###-####
on site conf on final
FIRE-Final Inspection9/29/20099/30/20099/30/2009PPART
DetailsForrest France
Items on correction notice verified for completion, final pending project related FIR permit final.
FIRE-Final Inspection9/24/20099/25/20099/28/2009PFAIL
DetailsForrest France
See fire code review note items numbers 1, 15, 17 for details, door hardware at some locations is not approved, gates at FD access road are incomplete, thresholds at the gym are not finished, noted one missing exit sign at the new gym per red-line plan annotations, discussed items needed for finals.
FIRE-Final Inspection9/23/20099/24/20099/24/2009ANR
DetailsForrest France
Project related FIR permits must be finaled prior to building fire life safety approvals.
BLD-Framing/Rough-in9/11/20099/11/20099/14/2009PPASS
DetailsTony Young
jerry - ceiling grid Phone #: ###-####
BLD-Conference9/4/20099/8/20099/8/2009APART
DetailsTony Young
Jerry Phone #: ###-####
ok to move some eqmt into basement room
FIRE-Conference8/28/20098/28/20098/28/2009PDONE
DetailsTroy Cobbley
Per Scott Arlenno and Mark Sentenno a job site meeting with the general contractor was held and the general contractor was notified which areas of the school were ok to occupy and which areas are not ok to occupy.
BLD-Framing/Rough-in8/21/20098/21/20098/21/2009PPART
DetailsTony Young
Jerry-ceiling grid inspection please Phone #: ###-####
misc grid work,, most ok,, pending trades,, general walk through of project
BLD-Framing/Rough-in7/10/20097/10/20097/10/2009PCANC
DetailsTony Young
Jerry Phone #: ###-####
BLD-Framing/Rough-in7/9/20097/10/20097/10/2009APART
DetailsTony Young
Jerry Phone #: ###-####
misc walls ,, ok
BLD-Framing/Rough-in6/26/20096/26/20096/26/2009PPART
DetailsTony Young
jerry Phone #: ###-####
partial wall on north,, interior walls main level bathrooms,, ceiling grids in basement on east side ok pending trades
BLD-Framing/Rough-in6/25/20096/26/20096/26/2009ACANC
DetailsTony Young
jerry Phone #: ###-####
BLD-Wall cover6/16/20096/17/20096/17/2009APART
DetailsTony Young
Jerry Phone #: ###-####
soth side exterior shear ok
BLD-Wall cover6/10/20096/11/20096/11/2009APART
DetailsTony Young
jerry Phone #: ###-####, shear
west side on north ok,, walls in basement ok to cover pending trades
BLD-Framing/Rough-in6/9/20096/10/20096/10/2009APART
DetailsTony Young
jerry Phone #: ###-####
west side,, wip shear
BLD-Framing/Rough-in6/4/20096/4/20096/4/2009PPART
DetailsTony Young
Shear inspection please-Jerry Phone #: ###-####
north ext shear ok
BLD-Framing/Rough-in5/28/20095/29/20095/29/2009APART
DetailsTony Young
Jerry Phone #: ###-####
studs ok to start covering on exterior for shear,, will add screws as needed,, add shots in plate as needed
BLD-Conference5/27/20095/28/20095/28/2009APART
DetailsTony Young
Jerry Phone #: ###-####
wip on fixes
BLD-Framing/Rough-in5/26/20095/27/20095/27/2009APART
DetailsTony Young
Jerry Phone #: ###-####
part,, need struct ok on as built on screw connection on double studs,, and on track connection,, ok to one side basement area pending trade ok's,,
BLD-Conference4/28/20094/29/20094/29/2009APART
DetailsTony Young
jerry Phone #: ###-####
walk about on job,, ok to put some sheet rock on upper wall line B for ducting
BLD-Concrete3/10/20093/11/20093/11/2009APART
DetailsTony Young
jerry - wall Phone #: ###-####
pending s i
BLD-Other3/2/20093/3/20093/3/2009APEND
DetailsTony Young
Jerry- rebar Phone #: ###-####
pending S.I.
BLD-Foundation2/24/20092/25/20092/25/2009APART
DetailsTony Young
jerry Phone #: ###-####,, elevator pit wall ok pending special inspection report
BLD-Footing2/23/20092/24/20092/24/2009APART
DetailsTony Young
jerry Phone #: ###-####
wip,, pending special inspection report,, interior column ftgs
BLD-Footing2/19/20092/20/20092/23/2009APART
DetailsTony Young
jerry Phone #: ###-####
pending special inspection
BLD-Footing2/17/20092/17/20092/17/2009APART
DetailsTony Young
jerry - rebar - around 11:00 if possible Phone #: ###-####
pending s. i. report
BLD-Other2/5/20092/6/20092/6/2009APART
DetailsJim Storey
jerry Note: rebar Phone #: ###-####placed w si pending report.
BLD-Other1/15/20091/16/20091/16/2009APASS
DetailsTony Young
jerry Note: rebar massonary Phone #: ###-####
ok pending s. i. report
BLD-Framing/Rough-in12/30/200812/31/200812/31/2008PPART
DetailsTony Young
Jerry,, temporary ramp,, ok,, ramp on north side
BLD-Other12/29/200812/30/200812/30/2008APART
DetailsTony Young
jerry Note: rebar Phone #: ###-####
10 interior ftgs for temp bracing in basement
pending special inspection report
BLD-Framing/Rough-in12/26/200812/29/200812/29/2008APART
DetailsTony Young
jerry Phone #: ###-####,, ramp framing
frame ok on temp ramp,, needs hand rails etc.
BLD-Framing/Rough-in12/24/200812/26/200812/26/2008ACANC
DetailsTony Young
jerry Phone #: ###-####,, ramp framing
will do on Monday
BLD-Framing/Rough-in12/24/200812/24/200812/26/2008PCANC
DetailsTony Young
jerry Phone #: ###-####,, ramp framing
BLD-Framing/Rough-in12/23/200812/24/200812/24/2008ACANC
DetailsTony Young
jerry Phone #: ###-####
BLD-Footing12/15/200812/16/200812/16/2008PPART
DetailsTony Young
jerry Note: rebar Phone #: ###-####
ftgs for trash encloser,, pending SI report
BLD-Conference12/10/200812/11/200812/12/2008APASS
DetailsTony Young
jerry Phone #: ###-####
job conf,, ok
BLD-Footing12/11/200812/12/200812/12/2008APASS
DetailsTony Young
JERRY Phone #: ###-####
temp ftgs for wall bracing ok,, 2 upper outside ftgs5"x10" by 24"
BLD-Conference12/9/200812/10/200812/10/2008APART
DetailsTony Young
jerry Phone #: ###-####
pre construction meeting,, ok