BLD-Final | 12/29/2008 | 12/30/2008 | 12/30/2008 | A | PASS |
Tom Arcoraci
|
|
|
jeramiah Phone #: ###-####
|
DOC - Permit Finaled | 12/30/2008 | 12/30/2008 | 12/30/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 11/28/2008 | 12/1/2008 | 12/1/2008 | A | PASS |
Mike Jordan
|
|
|
jeriamiah Phone #: ###-#### Note: please call 1/2 prior to inspection. Energy ok. Elevations were resubmitted and approved by zoning. ok to rock.
|
BLD-Framing/Rough-in | 11/25/2008 | 11/26/2008 | 11/26/2008 | P | PART |
Mike Jordan
|
|
|
jeramia Phone #: ###-####. Framing ok. Also check ESC permit. Needs to resubmit elevation drawings for canges to windows and using stucco.
|
BLD-Foundation | 10/29/2008 | 10/30/2008 | 10/30/2008 | P | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 8:11:01 AM. Contact: ###-####. Concrete already placed in stemwall when I arived on site.
|
BLD-Footing | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 8:10:28 AM. Contact: ###-####. wip.
|