Permit Information
Permit NumberBLD08-02169
StatusFinaled
Name ARTISAN BUILDERS
Site Address 11624 W PRESIDENT DR
Project NameENVIRO-TECH INC
Customer Number 
ePlanReviewNo
Description
(ENVIRO-TECH INC) **PLAN MODIFICATION PER THE APPROVED PLANS DATED 12/19/2008. ADDITION OF FULLY ACCESSIBLE MEZZANINE RESTROOM, ADDITION OF EXTERIOR DOOR AND SECOND STAIR FROM MEZZANINE, RECONSTRUCTION OF EXISTING STAIRWAY, CLARIFICATION OF FIRE-RATED OVERHEAD DOOR FRAME CONSTRUCTION. (SRZ)** Remodel to an existing tenant space. This building is not fire sprinklered. Work to include: demolish some existing non-bearing interior walls and a portion of an interior partition divider, install new exterior high windows with electric awnings on the east and west walls, repair sheetrock, paint, repair/install new trim, remove some existing plumbing fixtures, install new restroom, install walls and door for new compressor room, and install new drinking fountains. All work per approved plans, plan review report, and with all applicable codes and ordinances. CZC08-00155 **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/3/20093/4/20093/4/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/3/2009 at 4:41:53 PM. Contact: ###-####.
DOC - Permit Finaled3/4/20093/4/20093/4/2009PPASS
DetailsMike Jordan
ok for perm. occ.
BLD-Final2/25/20092/25/20092/25/2009PPART
DetailsMike Jordan
Rod- call 30 mins prior to going Phone #: ###-####. will be ok for final once plumbing has finaled. ok to move stuff in.
FIRE-Final Inspection2/24/20092/25/20092/25/2009APASS
DetailsTroy Cobbley
life safety passed. Contractor to remove the exit sign that is located in the shop but directs people to the locked door to the front offices. Sam the plan reviewer was ok with this due to seven other exits.
FIRE-Final Inspection2/19/20092/20/20092/20/2009APART
DetailsTroy Cobbley
The inspection today was just for the fire door which upon the second try and an adjustment worked correctly. Signage has not been provided yet.
FIRE-Final Inspection2/18/20092/18/20092/18/2009AFAIL
DetailsTroy Cobbley
See the city approved plans for locations of the deficiencies that include non-approved door hardware, inoperative exit signs and emergency lights. None of the exit discharge lights appear to have been installed. Also the new fire door fusible links have not been installed as per NFPA 80 and the door has not been tested/witnessed by the fire inspector.
BLD-Final2/17/20092/17/20092/17/2009PCANC
DetailsMike Jordan
Rod Phone #: ###-#### Inspection cancelled from web by: Alexandra Rahn
FIRE-Final Inspection2/17/20092/17/20092/17/2009PCANC
DetailsTroy Cobbley
rod Phone #: ###-#### Inspection cancelled from web by: Alexandra Rahn
BLD-Footing1/12/20091/13/20091/13/2009APASS
DetailsMike Jordan
rod Note: for slap for star lading Phone #: ###-####
BLD-Framing/Rough-in1/6/20091/6/20091/6/2009PPASS
DetailsMike Jordan
Rod Phone #: ###-####. Framing for new overhead fire door and installation of remainder of existing 2hr. fire barrier wall ok. Also reviewed resubmitted and approved plans.
BLD-Framing/Rough-in12/30/200812/31/200812/31/2008APART
DetailsJim Sly
ROD Phone #: ###-####
Framing OK for restroom at mezzanine.....Infill at existing rated firewall where ductwork was removed.....OK to install final layer.
BLD-Framing/Rough-in12/11/200812/11/200812/11/2008PPART
DetailsMike Jordan
rod Phone #: ###-####. fur out wall for new plumbing pipes ok.
BLD-Conference12/4/200812/5/200812/5/2008ADONE
DetailsMike Jordan
Meeting with contractor,architect and overhead door installer at 10:00am. Met on site with contractor, architect and dorr installer. Went over issues listed on c/n. Architect to provide revised drawings and submit to plan review.
BLD-Conference12/3/200812/4/200812/4/2008AFAIL
DetailsMike Jordan
Provide additional drawings and details for additional duct openings in firewall and show that openings including new fire door do not exceed 25%. Also provide UL listing and detailsfor thru penetrations. Also provide details on how openings are to be protected. Provide UL listing and details for jamb installation on fire door. Fire door is not in line with 2hr. fire wall, provide detail showing fire door in line with firewall or for continuation of jamb protection. Also provide details for code compliant stairway to mezz. Also noted that mezz may be used as breakroom, this is not shown on approved plans. If so, provide aditional details showing code compliant mezz and exiting. Also need to provide calcs to see if in place floor framing will support floor loads for breakroom or storage as is anticipated. Plans must be submitted to pland review for approval before any further work in these areas can proceed.
BLD-Conference12/4/200812/4/200812/4/2008ACANC
DetailsMike Jordan
Meeting with contractor, architect and overhead door installer at 10:00am.
BLD-Framing/Rough-in12/3/200812/3/200812/3/2008PPART
DetailsMike Jordan
Fireblocking and stud shoes added at framing for tumbler room. Also noted that mezz wants to be used as a breakroom, this is not shown on approved plans. Existing stairway is non compliant and mezz is enclosed, 2nd exit may be required. A conferance has been set up in am. A c/n on non compliant items will be issued at that time.
BLD-Framing/Rough-in12/2/200812/3/200812/3/2008AFAIL
DetailsMike Jordan
rod Phone #: ###-####. Needs to provide fireblocking at furred space at tunbler room and provide some stud shoes. Also noted uprotected openings in 2hr. fire wall. Noted to contracted that I would contact plan review and investigate further to see what needs to be done.