Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-02184
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8878 W EVENING STAR LN
Project NamePinetree Village
Customer Number 
ePlanReviewNo
Description
(Unit 3 Building 8) This permit is for the construction of a new townhouse with four attached units. This is unit 3 that has a total of 1278 square feet with an attached garage of 474 square feet. The main level is 689 square feet with one bathroom and a kitchen. The second story is a total of 589 square feet with three bedrooms and two bathrooms. Epoxy anchors are being used on the interior walls and these will require a special inspector's sign off that will be provided to the City of Boise inspector on site. SEE COMMENTS FOR ANCHOR INFO. The furnace has been placed in the attic space and will require a walkway in the attic and a working platform, see attached plan review report for details. The separation wall is built to WP 4136 as noted and detailed on the approved plans. This two hour wall may not have any penetrations, the columns in the garage must be placed inside the separation wall. R-2D zoning district, building setbacks, CUP07-00150, CUP08-00058, and DRH08-00043 per Planning and Zoning. Built per all approved plans, red lining, engineering and plan review report. (BSP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/20/200910/20/200910/20/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####
DOC - Permit Finaled10/20/200910/20/200910/20/2009PPASS
DetailsMike Jordan
Letter of occ. was issued.
BLD-Other4/23/20094/23/20094/23/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/23/2009 at 10:29:09 AM. Verified installation of exterior weather barrier.
BLD-Energy code compliance4/10/20094/13/20094/13/2009APASS
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in4/9/20094/9/20094/9/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/9/2009 at 7:57:53 AM.
BLD-Framing/Rough-in3/23/20093/23/20093/23/2009PNR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/20/20093/20/20093/20/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. Nailing on both layers of 5/8 type x rock for 2hr. firewall from ceiling to under side of roof deck.
BLD-Framing/Rough-in3/19/20093/19/20093/19/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/19/2009 at 7:04:09 AM. Contact: ###-####.
BLD-Framing/Rough-in3/18/20093/18/20093/18/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/18/2009 at 6:24:54 AM. Contact: ###-####. Nailing for both layers of 5/8 type x rock for 2hr. wall at overbuild areas. Also verified fire rated plywood for laydown parapets at overbuild areas.
BLD-Framing/Rough-in3/12/20093/13/20093/13/2009ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/12/2009 at 8:40:19 PM. Contact: ###-####.
BLD-Framing/Rough-in3/11/20093/11/20093/11/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/11/2009 at 7:20:49 AM. Contact: ###-####.
BLD-Framing/Rough-in3/10/20093/10/20093/10/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. 2nd. floor, 2nd layer of 5/8 type x rock both sides ok.
BLD-Footing3/9/20093/9/20093/9/2009PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/9/2009 at 6:55:39 AM. Contact: ###-####.
BLD-Framing/Rough-in3/6/20093/9/20093/9/2009ANR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/6/20093/6/20093/6/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. 2nd. floor, 2nd. layer of 5/8 type x rock, both sides for 2hr. fire wall.
BLD-Framing/Rough-in3/5/20093/5/20093/5/2009PNR
DetailsMike Jordan
jim Phone #: ###-####
BLD-Framing/Rough-in3/4/20093/4/20093/4/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/4/2009 at 7:07:57 AM. Contact: ###-####. 2nd. floor, 1st. layer of 5/8 type x rock, both sides for 2hr. fire wall.
BLD-Framing/Rough-in3/3/20093/3/20093/3/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/3/2009 at 7:32:51 AM. Contact: ###-####.
BLD-Framing/Rough-in3/2/20093/2/20093/2/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####. 1st. floor, 2nd. layer of 5/8 type x rock both sides for 2hr. fire wall.
BLD-Framing/Rough-in2/27/20092/27/20092/27/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/27/2009 at 9:19:05 AM. 1st.layer, 1st. floor of 5/8 type x rock, remaining side for 2hr fire wall.
BLD-Framing/Rough-in2/26/20092/26/20092/26/2009PPART
DetailsMike Jordan
Jim Phone #: ###-####. 1st. floor, 1st. layer of 5/8 type x rock, one side only for 2hr. fire wall.
BLD-Framing/Rough-in2/24/20092/25/20092/26/2009PCANC
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in2/23/20092/24/20092/24/2009PNR
DetailsMike Jordan
Jim This inspection is for the fire wall Phone #: ###-####
BLD-Framing/Rough-in2/23/20092/23/20092/23/2009PNR
DetailsMike Jordan
jim Phone #: ###-####
BLD-Footing2/16/20092/17/20092/17/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/16/2009 at 3:10:40 PM. Contact: ###-####. Interior footings ok.
BLD-Energy code compliance2/11/20092/12/20092/12/2009APASS
DetailsMike Jordan
Jim Please call before going out Phone #: ###-####. Rigid foam insul. at interior side of stemwall.
BLD-Foundation2/4/20092/5/20092/5/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/4/2009 at 8:23:24 AM. Contact: ###-####.
BLD-Footing2/4/20092/4/20092/4/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/4/2009 at 8:23:05 AM. Contact: ###-####.