Permit Information
Permit NumberBLD08-02189
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8906 W EVENING STAR LN
Project NamePinetree Village
Customer Number 
ePlanReviewNo
Description
(UNIT 4 BUILDING 7)This permit is for the construction of a new townhouse. This unit is required to be accessible and the builder in complying by submitting this as a type B unit. Per the governing code only one bathroom in a type B unit is required to be accessible, in this case that bathroom is located in the master bath. The counter tops also are required to be accessible as noted on the plans. This is a one level unit of 1051 square feet with two bedrooms and two bathrooms as well as an attached garage of 282 square feet. There is also a covered front porch of 36 square feet. The side setback for this unit is five feet, therefore the roof overhangs will encroach into the fire separation distance and are required to be rated to one hour on the underneath side per the detail on the approved plans. The separation wall is built to the gypsum detail WP 4136. See comments for anchors. R-2D zoning district, building setbacks, CUP07-00150, CUP08-00058, and DRH08-00043 per Planning and Zoning. Built per all approved plans, engineering, red lining, and plan review report. (BSP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/17/20096/17/20096/17/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/17/2009 at 9:23:14 AM.
DOC - Permit Finaled6/17/20096/17/20096/17/2009PPASS
DetailsMike Jordan
Cert of occ issued.
BLD-Other4/14/20094/14/20094/14/2009PPASS
DetailsMike Jordan
Jim- ###-####- building wrap. Verified installation exterior weather barrier.
BLD-Other4/10/20094/10/20094/10/2009PNR
DetailsMike Jordan
Jim- house wrap Phone #: ###-####
BLD-Energy code compliance3/31/20093/31/20093/31/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. ok to rock.
BLD-Energy code compliance3/30/20093/30/20093/30/2009PNR
DetailsMike Jordan
jim Phone #: ###-####
BLD-Framing/Rough-in3/27/20093/27/20093/27/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/27/2009 at 8:14:23 AM. Contact: ###-####. ok to insul.
BLD-Other3/25/20093/25/20093/25/2009PPASS
DetailsMike Jordan
Verified double layer5/8 type x rock at soffits ok.
BLD-Framing/Rough-in3/6/20093/9/20093/9/2009APASS
DetailsMike Jordan
Jim Phone #: ###-####. Verified nailing, both layers of 5/8 type x rock from 2nd. floor ceiling to underside of roof deck, both sides. Also verfied installation of fire rated plywood for laydown parapets at overbuild a areas.
BLD-Framing/Rough-in3/6/20093/6/20093/6/2009PNR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/5/20093/5/20093/5/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####. 2nd. floor, 2nd. layer, remaining side of 5/8 type x rock for 2hr. fire wall. ok.
BLD-Framing/Rough-in3/3/20093/3/20093/3/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/3/2009 at 7:29:57 AM. Contact: ###-####. 2nd. floor, 1st layer remaining side of 5/8 type x for 2hr. fire wall.
BLD-Framing/Rough-in3/2/20093/2/20093/2/2009PPART
DetailsMike Jordan
jim Phone #: ###-####. 2nd floor, 1st. layer 5/8 typex, one side only for 2hr. fire wall.
BLD-Framing/Rough-in2/27/20092/27/20092/27/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/27/2009 at 8:24:41 AM. Contact: ###-####.
BLD-Framing/Rough-in2/24/20092/25/20092/26/2009PCANC
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in2/23/20092/24/20092/24/2009ACANC
DetailsMike Jordan
Jim This inspection is for the fire wall Phone #: ###-####
BLD-Framing/Rough-in2/23/20092/23/20092/23/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####. 1st. floor, 2nd layer, both sides, 5/8 type x rock for 2hr. wall ok.
BLD-Framing/Rough-in2/23/20092/23/20092/23/2009APASS
DetailsMike Jordan
jim Phone #: ###-####. 1st. floor 2nd layer, type x rock, one side only.
BLD-Framing/Rough-in2/20/20092/20/20092/20/2009PPART
DetailsMike Jordan
1st. floor, 1st. layer, one side only, type x rock for 2hr. wall.
BLD-Framing/Rough-in2/19/20092/20/20092/20/2009ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/19/2009 at 9:52:40 PM. Contact: ###-####.
BLD-Footing2/13/20092/13/20092/17/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/13/2009 at 8:25:45 AM. Contact: ###-####. Interior foortings.
BLD-Energy code compliance1/29/20091/29/20091/29/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. Rigid foam insul at interior side of stemwall. ok.
BLD-Foundation1/27/20091/27/20091/27/2009PPASS
DetailsMike Jordan
bill Phone #: ###-####
BLD-Footing1/23/20091/23/20091/23/2009PPASS
DetailsMike Jordan
bill Phone #: ###-####. Perimeter footings.