BLD-Final | 4/21/2009 | 4/21/2009 | 4/21/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/21/2009 at 8:05:18 AM.
|
DOC - Permit Finaled | 4/21/2009 | 4/21/2009 | 4/21/2009 | P | PASS |
Mike Jordan
|
|
|
Cert. of occ was issued.
|
BLD-Final | 4/20/2009 | 4/20/2009 | 4/20/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/20/2009 at 6:56:00 AM. Needs plumbing final.
|
BLD-Other | 4/3/2009 | 4/3/2009 | 4/3/2009 | P | CANC |
Mike Jordan
|
|
|
Jim- building wrap Phone #: ###-####
|
BLD-Other | 3/20/2009 | 3/20/2009 | 3/20/2009 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/20/2009 at 7:00:54 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/18/2009 at 6:18:56 AM. Contact: ###-####. Inspected remaining layer of 5/8 type x rock in garages for 2hr. fire walls. Also verified installation of exterior water resitive barrier.
|
BLD-Energy code compliance | 3/12/2009 | 3/13/2009 | 3/13/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/12/2009 at 8:35:24 PM. ok to rock.
|
BLD-Framing/Rough-in | 3/11/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/11/2009 at 7:13:33 AM. ok to insul.
|
BLD-Energy code compliance | 3/10/2009 | 3/11/2009 | 3/11/2009 | P | CANC |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. 1st. layer of 5/8 type x rock from ceiling to bottom of roof deck, both sides.
|
BLD-Framing/Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/19/2009 at 9:58:10 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | PASS |
Mike Jordan
|
|
|
jim - firewalls Phone #: ###-####. Verified fire rated plywood for 4ft. laydown parapet at overbuild areas.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 5:05:26 PM. Contact: ###-####. nailing on type x rock at overbuild areas.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 2nd. floor, 2nd layer, both sides type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 2/17/2009 | 2/17/2009 | 2/17/2009 | P | PART |
Mike Jordan
|
|
|
Jim- Fire wall Phone #: ###-####. 2nd. floor, 1st. layer of 5/8 type x rock for 2hr. wall, both sides.
|
BLD-Framing/Rough-in | 2/11/2009 | 2/13/2009 | 2/13/2009 | P | NR |
Mike Jordan
|
|
|
jim - fire wall Phone #: ###-####
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer 5/8 type x rock for 2hr. wall, both sides.
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 5/8 type x rock for 2hr wall, remaining side.
|
BLD-Framing/Rough-in | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st.floor, 5/8 type x rock for 2hr. wall, one side only.
|
BLD-Footing | 2/4/2009 | 2/5/2009 | 2/5/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 2:51:04 PM. Contact: ###-####. Interior footings.
|
BLD-Energy code compliance | 1/23/2009 | 1/23/2009 | 1/23/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. Rigid insul. at interior side of stemwall.
|
BLD-Foundation | 1/21/2009 | 1/22/2009 | 1/22/2009 | P | PASS |
Mike Jordan
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 1/20/2009 | 1/21/2009 | 1/21/2009 | A | PASS |
Mike Jordan
|
|
|
Jim-###-####. Exterior permiter footings.
|