BLD-Final | 8/13/2009 | 8/13/2009 | 8/14/2009 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Mike Jordan
|
|
|
Cert. of occ. was issued.
|
BLD-Final | 8/13/2009 | 8/13/2009 | 8/13/2009 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/13/2009 at 6:07:14 AM. Stiil needs elec. final. Rescheduled for pm.
|
BLD-Other | 4/3/2009 | 4/3/2009 | 4/3/2009 | P | PASS |
Mike Jordan
|
|
|
Jim- building wrap Phone #: ###-####. Verified installation of weather resistive barrier. ok.
|
BLD-Framing/Rough-in | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/23/2009 at 6:12:24 AM. Contact: ###-####.
|
BLD-Energy code compliance | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/23/2009 at 6:12:24 AM. Contact: ###-####. ok for cover.
|
BLD-Framing/Rough-in | 3/20/2009 | 3/20/2009 | 3/20/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/20/2009 at 7:02:43 AM. Contact: ###-####. ok tgo insul. Also inspected double layer 5/8 type x rock underneath at soffitt area.
|
BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 | P | PASS |
Mike Jordan
|
|
|
Nailing for both layers of 5/8 type x rock from ceilng to underside of roof deck. Also verified fire rated plywood for laydown parapet at overbuild areas.
|
BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 | A | PASS |
Mike Jordan
|
|
|
Attachment of 5/8 typex rock for 2hr. fire walls at overbuild areas. ok.
|
BLD-Framing/Rough-in | 2/24/2009 | 2/25/2009 | 2/25/2009 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 2nd. floor, 2nd. layer, remaining side 5/8 type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | PASS |
Mike Jordan
|
|
|
2nd. floor, 1st. layer of 5/8 type x rock, remaining side for 2hr. fire wall.
|
BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 | A | NR |
Mike Jordan
|
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | CANC |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/19/2009 at 9:54:07 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | PASS |
Mike Jordan
|
|
|
jim - firewalls Phone #: ###-####. 2nd. floor, 2nd layer, one side of type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 10:08:12 PM. 2nd. floor, 1st. layer type x rock for 2hr. wall, one side only ok.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer, both sides 5'8 type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 2/17/2009 | 2/17/2009 | 2/17/2009 | P | PART |
Mike Jordan
|
|
|
Jim- Fire wall Phone #: ###-####. 1st. floor, 1st. layer of 5/8 type x rock for 2hr. wall, both sides.
|
BLD-Footing | 2/12/2009 | 2/12/2009 | 2/12/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/12/2009 at 7:39:23 AM. Contact: ###-####. Interior footings ok.
|
BLD-Energy code compliance | 2/2/2009 | 2/3/2009 | 2/3/2009 | A | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. rigid foam insul. on interior side of stemwall. ok.
|
BLD-Foundation | 1/29/2009 | 1/29/2009 | 1/29/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/29/2009 at 7:29:54 AM. Contact: ###-####.
|
BLD-Foundation | 1/27/2009 | 1/28/2009 | 1/28/2009 | P | PASS |
Mike Jordan
|
|
|
bill Phone #: ###-####
|
BLD-Foundation | 1/22/2009 | 1/23/2009 | 1/23/2009 | P | NR |
Mike Jordan
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 1/20/2009 | 1/21/2009 | 1/21/2009 | A | PASS |
Mike Jordan
|
|
|
Jim-###-####. Exterior permiter footings.
|