BLD-Final | 12/1/2009 | 12/2/2009 | 12/2/2009 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: James Larkin
|
DOC - Permit Finaled | 12/2/2009 | 12/2/2009 | 12/2/2009 | P | PASS |
Mike Jordan
|
|
|
Cert. of occ. issued.
|
BLD-Other | 4/3/2009 | 4/3/2009 | 4/3/2009 | P | PASS |
Mike Jordan
|
|
|
Jim- building wrap Phone #: ###-####.. Verified installation of weather resistive barrier.
|
BLD-Other | 3/20/2009 | 3/20/2009 | 3/20/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/20/2009 at 7:01:46 AM. Contact: ###-####. double layer 5/8 type x rock under soffitt.
|
BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 | P | CANC |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Energy code compliance | 3/6/2009 | 3/9/2009 | 3/9/2009 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. ok to rock.
|
BLD-Energy code compliance | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | CANC |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. ok to insul.
|
BLD-Framing/Rough-in | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | CANC |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/19/2009 at 10:03:02 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | NR |
Mike Jordan
|
|
|
jim - firewalls Phone #: ###-####
|
BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 5:14:42 PM. Contact: ###-####. 2nd layer type x rock from ceiling to roof deck, also verified nailing on type x rock for overbuilds and rated plywood for 4ft. parapet at overbuilds.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 2nd. floor, 2nd. layer, both sides, type x rock for 2hr. wall, also 1st. layer from ceiling to roof deck.
|
BLD-Framing/Rough-in | 2/17/2009 | 2/17/2009 | 2/17/2009 | P | PASS |
Mike Jordan
|
|
|
Jim- Fire wall Phone #: ###-####. 2nd. floor, 5/8 type x rock, remaining side.
|
BLD-Framing/Rough-in | 2/11/2009 | 2/13/2009 | 2/17/2009 | P | PART |
Mike Jordan
|
|
|
jim - fire wall Phone #: ###-####. 2nd. floor, 5/8type x rock one side only for 2hr. wall.
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer 5/8 typex rock for 2hr. wall both sides.
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st floor, 5/8 type x rock for 2hr. wall, remaining side.
|
BLD-Framing/Rough-in | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st.floor, 5/8type x rock for 2hr. wall. one side only.
|
BLD-Energy code compliance | 1/23/2009 | 1/23/2009 | 1/23/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. Rigid insul. at interior side of stemwal.
|
BLD-Foundation | 1/22/2009 | 1/22/2009 | 1/22/2009 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Foundation | 1/21/2009 | 1/22/2009 | 1/22/2009 | A | NR |
Mike Jordan
|
|
|
bill Phone #: ###-####. Rescheduled for pm.
|
BLD-Footing | 1/20/2009 | 1/21/2009 | 1/21/2009 | A | PASS |
Mike Jordan
|
|
|
Exterior perimeter footings.
|