BLD-Final | 3/10/2009 | 3/11/2009 | 3/11/2009 | A | PASS |
Mike Jordan
|
|
|
Don Phone #: ###-####
|
DOC - Permit Finaled | 3/11/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Mike Jordan
|
|
|
Letter of compliance issued.
|
BLD-Final | 3/9/2009 | 3/10/2009 | 3/10/2009 | A | NR |
Mike Jordan
|
|
|
Don Phone #: ###-####. Still has open elec. permit that needs finaled and also needs a zoning sign off. Called Don to let him know of outstanding items.
|
BLD-Other | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | CANC |
Bill VanDegrift
|
|
|
just needed the contractors phone number
|
BLD-Framing/Rough-in | 12/8/2008 | 12/8/2008 | 12/8/2008 | P | PASS |
Mike Jordan
|
|
|
don Phone #: ###-####. Framing in detached shop ok.
|
BLD-Framing/Rough-in | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | CANC |
Mike Jordan
|
|
|
don Phone #: ###-####. Performed insp. yesterday.
|
BLD-Framing/Rough-in | 11/19/2008 | 11/19/2008 | 11/19/2008 | P | PASS |
Mike Jordan
|
|
|
Verified 5/8 type x at ceiling and one hr. wall.
|
BLD-Framing/Rough-in | 11/18/2008 | 11/19/2008 | 11/19/2008 | A | NR |
Mike Jordan
|
|
|
don Note: drywall - if possible 10:00 am please Phone #: ###-####
|
BLD-Energy code compliance | 11/17/2008 | 11/18/2008 | 11/18/2008 | A | PASS |
Mike Jordan
|
|
|
don Phone #: ###-####
|
BLD-Framing/Rough-in | 11/14/2008 | 11/17/2008 | 11/17/2008 | A | PASS |
Mike Jordan
|
|
|
don Phone #: ###-####. ok to insul.
|
BLD-Framing/Rough-in | 11/13/2008 | 11/14/2008 | 11/14/2008 | P | NR |
Mike Jordan
|
|
|
don Phone #: ###-####
|
BLD-Conference | 10/27/2008 | 10/27/2008 | 10/27/2008 | P | DONE |
Mike Jordan
|
|
|
don Phone #: ###-####. On site to discuss 1hr. wall requirements with contractor for adu. It was decided to go with a 1hr wall up to ceiling and construct a draftstop in attic area and use 5/8 type X on ceiling in adu side.
|
BLD-Foundation | 10/21/2008 | 10/22/2008 | 10/22/2008 | A | PASS |
Mike Jordan
|
|
|
Don Phone #: ###-####
|
BLD-Footing | 10/20/2008 | 10/20/2008 | 10/20/2008 | P | PASS |
Mike Jordan
|
|
|
don Phone #: ###-####
|