Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-02241
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 921 W JEFFERSON ST
Project NameHal Davis Jewlers
Customer Number 
ePlanReviewNo
Description
This will be a change in occupancy from a B to an M. For the interior tenant improvements to an existing space per the approved plans. The improvements will include the construction of two office spaces, the installation of a new 6 sided modular vault (see the attached engineering and specification sheets for the supporting construction and vault installation instructions), changing the existing water fountain to a high-low accessible unit adding vertical grab bars to the existing ADA bathrooms and changing out the bathroom countertops and sinks. There will also be patch and repair of the existing suspended ceiling system, the placement of display cases and miscellaneous interior finishes. The building includes 4689 sq.ft. on the first story with a 804 sq.ft. mezzanine and a 1175 sq.ft. unimproved mechanical basement. This project does not include any improvements to the mezzanine. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/27/20091/28/20091/28/2009APASS
DetailsDave Hannah
dean Phone #: ###-#### ok for perm occ
BLD-Final1/22/20091/23/20091/23/2009APART
DetailsDave Hannah
dean Phone #: ###-#### everything ok but needs a plumbing final
FIRE-Final Inspection1/22/20091/22/20091/22/2009PPASS
DetailsForrest France
Life safety inspection passed, contractor to replace one lamp at the EM light fixture in the stairway to the mezzanine as discussed.
BLD-Other12/16/200812/17/200812/17/2008APART
DetailsDave Hannah
dean Note: ceiling grid Phone #: ###-#### ok to cover ceiling also I have a letter from the engineer oking structal on clouds I also talked with Roy McGlothin on 12/16 at around 10:00am about framing changes on clouds he told me that he was ok with everything
BLD-Framing/Rough-in12/11/200812/12/200812/12/2008AFAIL
DetailsDave Hannah
dean Phone #: ###-#### letter from engineer dont ok clouds
BLD-Framing/Rough-in11/26/200812/1/200812/1/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/26/2008 at 2:57:22 PM. ok to cover walls but need the engineer to ok the constrution of the lighing clouds hanging down from ceiling not per plans
BLD-Framing/Rough-in11/3/200811/3/200811/4/2008PPASS
DetailsDave Hannah
dean Phone #: ###-#### ok to sheet floor under safe