FIRE-Final Inspection | 12/8/2008 | 12/9/2008 | 12/9/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 12/9/2008 | 12/9/2008 | 12/9/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 12/8/2008 | 12/9/2008 | 12/9/2008 | A | NR |
Tom Arcoraci
|
|
|
|
BLD-Final | 12/5/2008 | 12/8/2008 | 12/8/2008 | P | NR |
Tom Arcoraci
|
|
|
doreen Phone #: ###-####
|
FIRE-Final Inspection | 12/5/2008 | 12/8/2008 | 12/8/2008 | A | FAIL |
Troy Cobbley
|
|
|
Still need the dead bolt removed from the gate to the basement and a "Door to remain unlocked while the building is occupied" sticker at the exit as per the original correction notice.
|
FIRE-Final Inspection | 10/31/2008 | 11/3/2008 | 11/3/2008 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the items listed on the floor plan have been corrected.
|
BLD-Final | 10/30/2008 | 10/31/2008 | 10/31/2008 | P | NR |
Tony Young
|
|
|
Kristen Phone #: ###-#### on site conf.. need to schedule f/l/s and struct again,, will also need suite #s
|
BLD-Final | 10/22/2008 | 10/23/2008 | 10/23/2008 | A | PEND |
Jim Sly
|
|
|
dorene - after 10:30 please Phone #: ###-#### Re-call after Fire finaled.
|