BLD-Final | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Tom Arcoraci
|
|
|
vern Phone #: ###-####
|
FIRE-Final Inspection | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 1/12/2009 | 1/12/2009 | 1/12/2009 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ready to sign off when the project related fire alarm permit is finaled
|
FIRE-Final Inspection | 11/20/2008 | 11/21/2008 | 11/21/2008 | A | FAIL |
Forrest France
|
|
|
Provide approved door hardware at three exit doors on the first floor, repair one set of exit doors 1st floor south side, repair one non-funtional EM light at the main level west side, remove surface bolt at the basement level exit NE corner, provide a current annual inspection for the existing fire sprinkler and fire alarm systems, noted one SSU at a basement storage room to be relocated, noted missing drop ceiling tiles throughout the basement level-area separation is missing between upright and pendent sprinkler heads.
|