BLD-Final | 5/4/2009 | 5/5/2009 | 5/5/2009 | A | PASS |
Dave Hannah
|
|
|
jeff Phone #: ###-####
|
DOC - Permit Finaled | 5/5/2009 | 5/5/2009 | 5/5/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 5/5/2009 | 5/5/2009 | 5/5/2009 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PART |
Dave Hannah
|
|
|
ok to cover after fire sprinkler is oked
|
BLD-Framing/Rough-in | 2/5/2009 | 2/5/2009 | 2/5/2009 | P | PART |
Jim Sly
|
|
|
jeff Phone #: ###-#### Interior framing only........ Verbal C/N. to Jeff and Framer.......Check DG1 3ply girder above stairway....... Eng. Shows Mid bearing point with 23,000 lb reaction? Verify with truss engineer. If valid, transfer point load to footing.....Provide Engineering for new footing. (no footing poured). OK to insulate.
|
BLD-Foundation | 12/3/2008 | 12/3/2008 | 12/3/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/3/2008 at 10:10:31 AM. Contact: ###-####.
|
BLD-Footing | 12/1/2008 | 12/1/2008 | 12/1/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/1/2008 at 6:59:05 AM. Contact: ###-####.
|
BLD-Footing | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/26/2008 at 8:25:12 AM. Contact: ###-####.
|