Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-02393
StatusFinaled
Name HEARTLAND CONSTRUCTION LLC
Site Address 1675 S MAPLE GROVE RD
Project NameCommunity Connection - Bld A
Customer Number 
ePlanReviewNo
Description
Community Connection - Building A - To construct a new 7,800 square foot, one story, wood framed office building and related site improvements. The tenant is a limited office use consisting of instructional independence learning and physical therapy for handicapped individuals. This building will contain play rooms, therapy rooms, offices, conference rooms, reception and waiting area, restrooms, break room and lunch room. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. DRH07-00579 JCM NEED RP PRIOR TO ISSUANCE. 8-6-09 FINAL CERT OF VALUE $ 925,,347.00 ///DLD
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/1/20096/2/20096/2/2009PPART
DetailsMike Jordan
christine Phone #: ###-####. ok for temp occ. Needs to install remaing glazing in doors, provide hc signs and complete firecaulking in riser room.
FIRE-Final Inspection6/1/20096/2/20096/2/2009APASS
DetailsTroy Cobbley
Life Safety Passed
FIRE-Final Inspection6/1/20096/1/20096/1/2009PFAIL
DetailsTroy Cobbley
The northwest exit discharge light failed to operate.
BLD-Other5/20/20095/21/20095/21/2009APASS
DetailsMike Jordan
Christine- grid Phone #: ###-####. Grid ok.
BLD-Other5/19/20095/20/20095/20/2009PFAIL
DetailsMike Jordan
Christine- grid Phone #: ###-####. Installed grid not per approved plan.
BLD-Framing/Rough-in4/24/20094/24/20094/24/2009PPASS
DetailsMike Jordan
christine Phone #: ###-####. All issues resolved. Received engineering noting that 2x6 with double top plate is adequate for piont loads. Will have scanned into permit.
BLD-Energy code compliance4/24/20094/24/20094/24/2009PPASS
DetailsMike Jordan
christine Phone #: ###-####
BLD-Framing/Rough-in4/22/20094/23/20094/23/2009APART
DetailsMike Jordan
christine Phone #: ###-####. Needs to add lateral bracing on bottom chords, provide letter from engineer regarding point loads on 2x6 walls. Also needs to provide tbh on truss eg1 and 2.
BLD-Framing/Rough-in4/22/20094/22/20094/22/2009PPART
DetailsMike Jordan
christine Phone #: ###-####. ok to insul. exterior walls and one side only. Needs to provide new truss engineering and sprinkler ri insp.
BLD-Framing/Rough-in3/26/20093/26/20093/26/2009PPART
DetailsMike Jordan
roof inspection-christine Phone #: ###-####. Nailing on roof diaphragm ok. Also gave contractor c/n noting to resubmit mezzanine drawings and all applicable engineering showing bonus truss in leiu of TJI and additional square footage added.
BLD-Framing/Rough-in3/20/20093/23/20093/23/2009APART
DetailsMike Jordan
building a only please--shear nail christine Phone #: ###-####. Shear nailing on exterior walls only. ok.
FIRE-Conference3/17/20093/17/20093/17/2009PDONE
DetailsTroy Cobbley
I spoke to Brian Johnson with Shilo Automatic Sprinkler about the sizing of the piping from the FDC to the floating main. I gave my interpretation of NFPA 13-8.17.2 but defered him to Tim Frost. The entry is being made under this permit due to the overhead sprinkler permit not being issued at this time.
BLD-Foundation3/3/20093/4/20093/4/2009APASS
DetailsMike Jordan
Ian Phone #: ###-####. Stemwall for dumpster enclosure ok.
BLD-Foundation3/2/20093/3/20093/3/2009APASS
DetailsMike Jordan
ian Phone #: ###-####. Perimeter stemwalls and column pad pdestals. ok.
BLD-Footing2/27/20092/27/20092/27/2009PPASS
DetailsMike Jordan
Ian Phone #: ###-####. Perimeter footings and column pad footings ok.
BLD-Footing2/27/20092/27/20092/27/2009PCANC
DetailsMike Jordan
ian Phone #: ###-####
BLD-Footing2/25/20092/26/20092/26/2009PNR
DetailsMike Jordan
ian Phone #: ###-####. Contractor will reschedule insp.