Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD08-02395
StatusFinaled
Name HEARTLAND CONSTRUCTION LLC
Site Address 1675 S MAPLE GROVE RD
Project NameCommunity Connection - Bld B
Customer Number 
ePlanReviewNo
Description
Community Connection - Building B - To demolish and remove an existing single family dwelling and other out buildings; and to construct a new 7,670 square foot, one story, wood framed office building and related site improvements. The tenant is a limited office use consisting of instructional independence learning and physical therapy for handicapped individuals. This building will contain teen rooms, adult room, recreation room, therapy rooms, offices, conference rooms, reception area, restrooms, break room and lunch room. There is a 1,165 square foot, unfinished area for future expansion. The future unfinished area will require a separate tenant improvement permit to finish for occupancy. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. DRH07-00579 JCM NEED RP PRIOR TO ISSUANCE. 8-6-09 FINAL CERT OF VALUE $ 757,102.00 ///DLD
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/29/20096/29/20096/29/2009PCANC
DetailsMike Jordan
christine Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection6/29/20096/29/20096/29/2009PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection6/25/20096/26/20096/26/2009PFAIL
DetailsTroy Cobbley
The project related fire alarm and fire sprinkler permits need finaled and two exit discharge lights on the east side did not work.
BLD-Framing/Rough-in6/9/20096/10/20096/10/2009APASS
DetailsMike Jordan
christine - ceiling grid Phone #: ###-####
BLD-Other5/15/20095/15/20095/15/2009PPASS
DetailsMike Jordan
Chistine Phone #: ###-####. 1hr. const. for fire riser room.
BLD-Other5/13/20095/14/20095/14/2009ACANC
DetailsMike Jordan
christine - 1 hr construction on a fire riser Phone #: ###-####
BLD-Energy code compliance5/11/20095/11/20095/11/2009PPASS
DetailsMike Jordan
Christine Phone #: ###-####
BLD-Final5/7/20095/8/20095/8/2009ACANC
DetailsMike Jordan
christine Phone #: ###-####
BLD-Framing/Rough-in5/8/20095/8/20095/8/2009APASS
DetailsMike Jordan
christine Phone #: ###-####
BLD-Framing/Rough-in4/28/20094/29/20094/29/2009ANR
DetailsMike Jordan
Christine Phone #: ###-####. Needs ri. imsp. from other trades first.
BLD-Other3/31/20094/1/20094/1/2009APART
DetailsMike Jordan
Christine- roof nailing Phone #: ###-####. Nailing for roof ok.
BLD-Framing/Rough-in3/26/20093/26/20093/26/2009PPART
DetailsMike Jordan
Shear Inspection -christine Phone #: ###-####. Exterior shear nailing only, ok. Also gave contactor c/n noting to resubmit mezzanine drawing and all applicable engineering showing use of bonus trusses in leiu of TJI and additional square footage.
BLD-Foundation3/2/20093/3/20093/3/2009APASS
DetailsMike Jordan
ian Phone #: ###-####. Perimeter stemwalls and pedestals on column pad footings. ok.
BLD-Footing3/2/20093/2/20093/2/2009PPASS
DetailsMike Jordan
Ian Phone #: ###-####. Exterior column pad footings.
BLD-Footing2/25/20092/26/20092/26/2009PPASS
DetailsMike Jordan
ian Phone #: ###-####. Perimeter footings ok.