Permit Number | BLD08-02445 |
Status | Finaled |
Name |
VERTICAL CORP
|
Site Address |
3123 S BOWN WY
|
Project Name | EASTSIDE CYCLES 1ST STORY |
Customer Number | |
ePlanReview | No |
Description |
(EASTSIDE CYCLES - 1ST STORY) The fire sprinkler system is used for code trade-offs, story increase, and for fire flow. To prepare a 1,090 square foot space located on the 1st story of a new building for a retail sales tenant. Work is to include a restroom accessible to the disabled, interior nonbearing walls, furred walls, millwork, and finishes. The roof top HVAC unit will be relocated from another area and placed on an existing curb. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
|