BLD-Final | 5/22/2009 | 5/26/2009 | 5/27/2009 | A | PASS |
Dave Hannah
|
|
|
bill Phone #: ###-####
|
FIRE-Final Inspection | 5/21/2009 | 5/22/2009 | 5/22/2009 | A | PASS |
Forrest France
|
|
|
Noted plan modification okayed, fire life safety final walkthrough passed.
|
FIRE-Final Inspection | 5/19/2009 | 5/20/2009 | 5/20/2009 | P | FAIL |
Troy Cobbley
|
|
|
The life safety will be ok to pass when the project related fire sprinkler permit is passed
|
FIRE-Final Inspection | 4/29/2009 | 4/30/2009 | 4/30/2009 | A | FAIL |
Forrest France
|
|
|
Project is not in condition for final fire life safety at this time, FIR09-00101 is not ready for final, some items incomplete including door hardware, floor finishes, drop ceilings not in place, etc. Notified contractor that a separate tenant permit request for occupancy is needed per the project description prior to use.
|
BLD-Other | 4/28/2009 | 4/29/2009 | 4/29/2009 | P | PASS |
Dave Hannah
|
|
|
Bill- ceiling Phone #: ###-####
|
BLD-Framing/Rough-in | 1/22/2009 | 1/22/2009 | 1/23/2009 | P | PASS |
Dave Hannah
|
|
|
bill Phone #: ###-####
|