BLD-Final | 8/31/2009 | 9/1/2009 | 9/1/2009 | A | PASS |
Jim Storey
|
|
|
Alan Phone #: ###-####
|
DOC - Permit Finaled | 9/1/2009 | 9/1/2009 | 9/1/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Grading Inspection | 9/1/2009 | 9/1/2009 | 9/1/2009 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | FAIL |
Jim Storey
|
|
|
Alan Phone #: ###-#### saftey glazing/ handrails.
|
BLD-Energy code compliance | 5/7/2009 | 5/8/2009 | 5/8/2009 | A | PASS |
Jim Storey
|
|
|
Alan Phone #: ###-####
|
BLD-Other | 5/5/2009 | 5/6/2009 | 5/6/2009 | A | PART |
Jim Storey
|
|
|
Alan- foam and seal Phone #: ###-#### seal draft stop and pipe chase fur out/ holddown basement behind lav back wall. ok to insulate.
|
BLD-Other | 4/8/2009 | 4/9/2009 | 4/9/2009 | A | PASS |
Jim Storey
|
|
|
Alan- sheer wall Phone #: ###-#### gyp on wall and soffit ok to cover exterior.
|
BLD-Framing/Rough-in | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Jim Storey
|
|
|
shear nail inspection please-Allan Phone #: ###-#### sheer nailling ok
|
BLD-Foundation | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/3/2009 at 7:44:13 AM. Contact: ###-####.
|
BLD-Footing | 2/2/2009 | 2/2/2009 | 2/2/2009 | P | PASS |
Jim Storey
|
|
|
gary Phone #: ###-####
|
BLD-Foundation | 1/22/2009 | 1/22/2009 | 1/22/2009 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/22/2009 at 7:24:51 AM. Contact: ###-####.
|
BLD-Footing | 1/19/2009 | 1/20/2009 | 1/20/2009 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/19/2009 at 8:25:51 AM. Contact: ###-####.ft ok west side of bld.
|