**(COACH)** - (BOISE TOWNE SQUARE -SPACE #1164) To remodel an existing 2,550 square foot retail tenant space per approved plans and engineering on file. Work to include: [installation of new non-combustible interior partition walls to create, a unisex accessible restroom, one stock room (378 square feet), and a large sales floor (1,326 square feet)], installation of new flooring throughout, construction of a new storefront system, installation of suspended gypsum ceiling system and related lighting, installation of new mechanical system (grilles, diffusers, ductwork, and new units), miscellaneous related interior finishes, and ten foot tall storage racks in the stock room. This building is fully fire sprinklerd any alterations to the sprinkler system shall be maintained per NFPA #13 as regulated by the fire department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks.**TLW** PLAN MODIFICATION - applicant has submitted an alternate design for storefront system and modification to over all floor design. The modification is to clarify existing conditions and by doing so it reduces the overall square footage by 26 sq ft. This modification was approved on 3-30-09 by TLW.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection5/14/20095/18/20095/18/2009APASS
DetailsTroy Cobbley
life safety passed
BLD-Final5/14/20095/18/20095/18/2009PPASS
DetailsMike Jordan
forrest Phone #: ###-####. ok for perm occ.
BLD-Other4/30/20095/1/20095/1/2009APASS
DetailsMike Jordan
Forrest- racking Phone #: ###-####
BLD-Framing/Rough-in4/27/20094/28/20094/28/2009APASS
DetailsMike Jordan
forrest - ceiling cover Phone #: ###-####
BLD-Framing/Rough-in4/24/20094/27/20094/27/2009APART
DetailsMike Jordan
forrest Phone #: ###-####. Needs to install clips on all main and cross runners. Will check on final.
BLD-Framing/Rough-in4/6/20094/7/20094/7/2009APASS
DetailsMike Jordan
Forrest Phone #: ###-####. Framing in restrooms. Also verified with contractor that backing is fire treated wood.
BLD-Framing/Rough-in4/3/20094/6/20094/6/2009APASS
DetailsMike Jordan
Forrest Phone #: ###-####. Grid has been installed as per plan.
BLD-Framing/Rough-in4/1/20094/3/20094/3/2009APART
DetailsMike Jordan
Forrest Phone #: ###-####. Needs to install gird as per approved plan or get rfi fro architect. Interio framed walls ok.