BLD-Final | 4/3/2009 | 4/7/2009 | 4/7/2009 | A | PASS |
Dave Hannah
|
|
|
###-#### MOONS Derek Phone #: ###-#### ok for perm occ
|
BLD-Final | 12/22/2008 | 12/24/2008 | 12/30/2008 | P | CANC |
Dave Hannah
|
|
|
Bob Please call first to see if CDH has been by Phone #: ###-####
|
BLD-Final | 12/26/2008 | 12/26/2008 | 12/26/2008 | P | PART |
Dave Hannah
|
|
|
ok for temp occ
|
FIRE-Final Inspection | 12/26/2008 | 12/26/2008 | 12/26/2008 | P | PASS |
Forrest France
|
|
|
C/N items verified for compliance, fire life safety inspection passed.
|
FIRE-Final Inspection | 12/22/2008 | 12/24/2008 | 12/24/2008 | P | PASS |
Forrest France
|
|
|
See inspection completed per S. Arellano.
|
FIRE-Conference | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | DONE |
Forrest France
|
|
|
On site conference regarding building fire life safety requirements, need to provide verification of a current annual certification for the existing fire sprinkler system.
|