Permit Information
Permit NumberBLD08-02568
StatusFinaled
Name BENCHMARK CONSTRUCTION INC
Site Address 3630 N EAGLE RD
Project NameHome Fed Bank - Bald Cypress
Customer Number 
ePlanReviewNo
Description
Home Federal Bank - Bald Cypress Branch - To construct a new 4,700 square foot, one story, wood framed bank office building with covered drive-thru. This permit also included related site improvements. All construction per the approved plans and attached comment list. DRH08-00346 JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/31/20099/1/20099/1/2009APASS
DetailsJim Sly
Shawn Phone #: ###-####
OK for Perm Occ.
BLD-Final8/28/20098/31/20098/31/2009PNR
DetailsJim Sly
Shawn Phone #: ###-####
need P/W
FIRE-Final Inspection8/28/20098/31/20098/31/2009APASS
DetailsTroy Cobbley
life safety passed. The lights have been repaired.
BLD-Final8/27/20098/28/20098/28/2009PNR
DetailsJim Sly
Shawn Phone #: ###-####
Need Fire for Perm....P/W.....
FIRE-Final Inspection8/27/20098/28/20098/28/2009APART
DetailsTroy Cobbley
A temporary occupancy was being given with mark sentennos permission until the two missing emergency lights have been installed. All other items are passed. I waited while the sample tubes in the duct detector were installed correctly.
BLD-Other8/18/20098/19/20098/18/2009APASS
DetailsJim Sly
shawn - ceiling grid Phone #: ###-####
Ceiling Grid Pass................Disregard previous framing Inspection....(ie...Eng to Ok double stud nai...........) Mistake.....
BLD-Framing/Rough-in8/17/20098/18/20098/18/2009APART
DetailsJim Sly
Shawn Phone #: ###-####
Shear panel nailing OK......Waiting for OK from Eng for attachment of double studs at panel ends.... (Pre mfg panels)
BLD-Energy code compliance7/29/20097/30/20097/30/2009APASS
DetailsJim Storey
Shawn Phone #: ###-#### roof made ok
BLD-Energy code compliance7/27/20097/28/20097/28/2009APART
DetailsJim Storey
shawn Phone #: ###-#### ok need recalc. for roof deck to meet r 30
BLD-Framing/Rough-in7/27/20097/28/20097/28/2009APASS
DetailsJim Storey
shawn Phone #: ###-#### drive thru roof nailling ok to cover
BLD-Framing/Rough-in7/24/20097/24/20097/24/2009PPASS
DetailsMike Jordan
Shawn if possible around 2 pm Phone #: ###-####. Interior and exterior framed walls and hardlids ok. All straps installed. Interior shear walls ok.
BLD-Framing/Rough-in7/21/20097/21/20097/21/2009PPART
DetailsMike Jordan
Shawn-if possible around 2 or 2:30 please Phone #: ###-####. Extrior shear nailing and nailing for roof diapragm. Also inspected and verified straps on exterior side of roof. Still needs to nstall straps for drag struts below.
BLD-Framing/Rough-in7/14/20097/14/20097/14/2009PPART
DetailsJim Sly
SHAWN Phone #: ###-####
Inspection of hold downs and fireblocking at (3) popped out walls........West wall toward Eagle Rd. OK to cover.
BLD-Conference7/9/20097/9/20097/9/2009PPASS
DetailsJim Sly
shaun Phone #: ###-####
Verified hold down at W. wall ....Electrical room......OK to cover.
BLD-Foundation6/22/20096/23/20096/23/2009APART
DetailsJim Sly
shawn - stem wall Phone #: ###-####
Wall OK pending MTI inspection, tests and approvals.
BLD-Foundation6/17/20096/18/20096/18/2009APART
DetailsJim Sly
shawn - late morning - pouring at 1 Phone #: ###-####
Rebar appears OK at footings except for an area for truck access to be completed later. MTI special insp on Compressive strength for concrete.