BLD-Final | 8/31/2009 | 9/1/2009 | 9/1/2009 | A | PASS |
Jim Sly
|
|
|
Shawn Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 8/28/2009 | 8/31/2009 | 8/31/2009 | P | NR |
Jim Sly
|
|
|
Shawn Phone #: ###-#### need P/W
|
FIRE-Final Inspection | 8/28/2009 | 8/31/2009 | 8/31/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. The lights have been repaired.
|
BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 | P | NR |
Jim Sly
|
|
|
Shawn Phone #: ###-#### Need Fire for Perm....P/W.....
|
FIRE-Final Inspection | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was being given with mark sentennos permission until the two missing emergency lights have been installed. All other items are passed. I waited while the sample tubes in the duct detector were installed correctly.
|
BLD-Other | 8/18/2009 | 8/19/2009 | 8/18/2009 | A | PASS |
Jim Sly
|
|
|
shawn - ceiling grid Phone #: ###-#### Ceiling Grid Pass................Disregard previous framing Inspection....(ie...Eng to Ok double stud nai...........) Mistake.....
|
BLD-Framing/Rough-in | 8/17/2009 | 8/18/2009 | 8/18/2009 | A | PART |
Jim Sly
|
|
|
Shawn Phone #: ###-#### Shear panel nailing OK......Waiting for OK from Eng for attachment of double studs at panel ends.... (Pre mfg panels)
|
BLD-Energy code compliance | 7/29/2009 | 7/30/2009 | 7/30/2009 | A | PASS |
Jim Storey
|
|
|
Shawn Phone #: ###-#### roof made ok
|
BLD-Energy code compliance | 7/27/2009 | 7/28/2009 | 7/28/2009 | A | PART |
Jim Storey
|
|
|
shawn Phone #: ###-#### ok need recalc. for roof deck to meet r 30
|
BLD-Framing/Rough-in | 7/27/2009 | 7/28/2009 | 7/28/2009 | A | PASS |
Jim Storey
|
|
|
shawn Phone #: ###-#### drive thru roof nailling ok to cover
|
BLD-Framing/Rough-in | 7/24/2009 | 7/24/2009 | 7/24/2009 | P | PASS |
Mike Jordan
|
|
|
Shawn if possible around 2 pm Phone #: ###-####. Interior and exterior framed walls and hardlids ok. All straps installed. Interior shear walls ok.
|
BLD-Framing/Rough-in | 7/21/2009 | 7/21/2009 | 7/21/2009 | P | PART |
Mike Jordan
|
|
|
Shawn-if possible around 2 or 2:30 please Phone #: ###-####. Extrior shear nailing and nailing for roof diapragm. Also inspected and verified straps on exterior side of roof. Still needs to nstall straps for drag struts below.
|
BLD-Framing/Rough-in | 7/14/2009 | 7/14/2009 | 7/14/2009 | P | PART |
Jim Sly
|
|
|
SHAWN Phone #: ###-#### Inspection of hold downs and fireblocking at (3) popped out walls........West wall toward Eagle Rd. OK to cover.
|
BLD-Conference | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | PASS |
Jim Sly
|
|
|
shaun Phone #: ###-#### Verified hold down at W. wall ....Electrical room......OK to cover.
|
BLD-Foundation | 6/22/2009 | 6/23/2009 | 6/23/2009 | A | PART |
Jim Sly
|
|
|
shawn - stem wall Phone #: ###-#### Wall OK pending MTI inspection, tests and approvals.
|
BLD-Foundation | 6/17/2009 | 6/18/2009 | 6/18/2009 | A | PART |
Jim Sly
|
|
|
shawn - late morning - pouring at 1 Phone #: ###-#### Rebar appears OK at footings except for an area for truck access to be completed later. MTI special insp on Compressive strength for concrete.
|