BLD-Final | 4/13/2009 | 4/14/2009 | 4/14/2009 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/13/2009 at 4:30:51 PM. Contact: ###-####. ok for perm occ
|
BLD-Final | 4/1/2009 | 4/2/2009 | 4/2/2009 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/31/2009 at 9:55:23 AM. Contact: ###-####. ok for temp occ ook for perm after the cover on the duct work in the star tower is completed
|
BLD-Final | 3/31/2009 | 4/1/2009 | 4/1/2009 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/31/2009 at 9:55:23 AM. Contact: ###-####.
|
FIRE-Final Inspection | 4/1/2009 | 4/1/2009 | 4/1/2009 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable.
|
FIRE-Final Inspection | 3/31/2009 | 4/1/2009 | 4/1/2009 | A | NR |
Forrest France
|
|
|
Project related fire sprinkler permit work is not ready for final, noted one overspaced head at the kitchen area due to relocated wall. Remainder of life safety items inspected okayed including fire alarm and type one hood.
|
FIRE-Final Inspection | 3/31/2009 | 3/31/2009 | 3/31/2009 | P | NR |
Forrest France
|
|
|
Project related fire alarm, hood suppression, and fire sprinkler permit work has not been scheduled for inspection or approved for final.
|
BLD-Framing/Rough-in | 3/24/2009 | 3/24/2009 | 3/25/2009 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/24/2009 at 10:16:15 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/25/2009 | 3/25/2009 | 3/25/2009 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/25/2009 at 9:18:37 AM. Contact: ###-####.ok to cover shaft
|
BLD-Framing/Rough-in | 3/16/2009 | 3/17/2009 | 3/18/2009 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/16/2009 at 3:40:01 PM. Contact: ###-####.ok to cover walls
|