Permit Number | BLD09-00109 |
Status | Finaled |
Name |
STOCK CONSTRUCTION MANAGEMENT
|
Site Address |
3536 W HILL RD
|
Project Name | Hillside Jr. High Locker Room |
Customer Number | |
ePlanReview | No |
Description |
(Hillside Junior High - Locker Room Addition & NFPA 13 Fire Suppression / Alarm System) To build a 4,058 sq. ft. locker room addition on the northeast end of the existing 70,641 sq. ft. school building; construction of an 8", 2-hour, masonry fire barrier wall separating the new Type V-B construction from the existing Type VB construction. The new construction will be constructed of non-combustible materials per approved Alternate Request Letter on file, approved by Building Official & Fire Marshall. The entire school (new and existing) will be fully fire sprinklered per NFPA 13 as regulated by the fire department as part of this permit. A Grading & Drainage with site utilities permit is being issued under BLD09-00108. Work includes construction of a reinforced concrete foundation, stem wall, piers, footings and concrete slab; assembly of a pre-manufacture steel building frame with metal skin siding and roofing, construction of reinforced masonry fire barrier wall with protected 90 minute door opening and fire/smoke dampers at duct penetrations at the south end wall and north end steel frame wall, insulation and finishes; fully accessible shower / locker / restrooms for boys and girls; installation of suspended ceiling grid system, electrical, mechanical, plumbing, fire suppression and alarm systems, all per reviewed plans. This lot is within the floodplain area. An elevation certificate has been submitted and accepted by Jim Wylie, Public Works Dept. drs CUP08-00132
|