Permit Information
Permit NumberBLD09-00145
StatusFinaled
Name BRICON INC
Site Address 3330 W GRACE ST
Project NameLHTAC
Customer Number 
ePlanReviewNo
Description
Local Highway Technical Assistance Council - To construct a new 5,800 square foot, two story, wood framed office building and related site improvements. This building will be fully fire sprinkled. 1st Floor: 3,110 sq. ft. 2nd Floor: 2,690 sq. ft.. There is an existing office building on this site that will be demolished and removed from the location of the new parking lot. This building will be demolished and removed after completion of the new office building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/29/20106/30/20106/30/2010PPASS
DetailsTony Young
herb Phone #: ###-####,, perm occ ok,, pending zoning
BLD-Final5/6/20105/7/20105/7/2010APART
DetailsTony Young
herb Phone #: ###-####,, temp occ. ok,, need full signoffs from others,, need bottom rise off exterior stairs to be in compliance
FIRE-Final Inspection5/7/20105/7/20105/7/2010PPASS
DetailsForrest France
Reinspection for C/N items completed satisfactory. Fire life safety passed.
FIRE-Final Inspection5/6/20105/7/20105/7/2010AFAIL
DetailsForrest France
Need to repair one exit sign first floor west side, two EM lights second floor are not operational, exit discharge light at the main entry is not functional, missing fire stop at some penetrations in the rated ceiling at the riser room.
FIRE-Alarm Testing5/4/20105/4/20105/4/2010PDONE
DetailsForrest France
See project related FIR permit activities for fire alarm and sprinkler inspection notes, discussed signage at the riser and FACP room door, review notes, list of general life safety requirements, etc.
FIRE-Final Inspection5/3/20105/3/20105/3/2010AFAIL
DetailsForrest France
Refer to fire code review note item #19, discussed knox box installation and remainder of issues for final.
BLD-Final4/29/20104/29/20104/29/2010PNR
DetailsTony Young
Herb Phone #: ###-####,, correction posted,, need trades,, etc,, on site walk through
BLD-Wall cover3/30/20103/30/20103/30/2010PPASS
DetailsTony Young
herb Phone #: ###-####,, ceiling grid ok
BLD-Framing/Rough-in2/22/20102/23/20102/23/2010AFAIL
DetailsTony Young
Ceiling grid inspection please-Herb Phone #: ###-####,, need trades signed off for above ceiling,, on site walk through,, should be ok on ceiling after trades
BLD-Energy code compliance1/11/20101/11/20101/11/2010PPASS
DetailsTony Young
Herb Phone #: ###-####
BLD-Conference1/4/20101/5/20101/5/2010APART
DetailsTony Young
jerel,, 11am please,, frame conference
w/ framer and contractor,, ok to insulate now,, still has a c/notice
BLD-Framing/Rough-in12/28/200912/29/200912/29/2009AFAIL
DetailsTony Young
herb Phone #: ###-####
,, 2 page c/n posted
BLD-Framing/Rough-in12/28/200912/28/200912/28/2009PPART
DetailsTony Young
herb Phone #: ###-####
conf only,, need to get special inspection reports
BLD-Other8/14/20098/14/20098/14/2009PPASS
DetailsDave Hannah
foundation wall inspection// wants to pour at 2:30, has special inspection by MTI//Herb Brice Phone #: ###-#### ok to pour foundation
BLD-Footing8/12/20098/13/20098/13/2009APART
DetailsTony Young
Mark Phone #: ###-####
ok pending sp
BLD-Conference8/12/20098/12/20098/12/2009PPASS
DetailsTony Young
Mark Phone #: ###-####
ftgs, wip,, will need a special inspection