BLD-Final | 6/29/2010 | 6/30/2010 | 6/30/2010 | P | PASS |
Tony Young
|
|
|
herb Phone #: ###-####,, perm occ ok,, pending zoning
|
BLD-Final | 5/6/2010 | 5/7/2010 | 5/7/2010 | A | PART |
Tony Young
|
|
|
herb Phone #: ###-####,, temp occ. ok,, need full signoffs from others,, need bottom rise off exterior stairs to be in compliance
|
FIRE-Final Inspection | 5/7/2010 | 5/7/2010 | 5/7/2010 | P | PASS |
Forrest France
|
|
|
Reinspection for C/N items completed satisfactory. Fire life safety passed.
|
FIRE-Final Inspection | 5/6/2010 | 5/7/2010 | 5/7/2010 | A | FAIL |
Forrest France
|
|
|
Need to repair one exit sign first floor west side, two EM lights second floor are not operational, exit discharge light at the main entry is not functional, missing fire stop at some penetrations in the rated ceiling at the riser room.
|
FIRE-Alarm Testing | 5/4/2010 | 5/4/2010 | 5/4/2010 | P | DONE |
Forrest France
|
|
|
See project related FIR permit activities for fire alarm and sprinkler inspection notes, discussed signage at the riser and FACP room door, review notes, list of general life safety requirements, etc.
|
FIRE-Final Inspection | 5/3/2010 | 5/3/2010 | 5/3/2010 | A | FAIL |
Forrest France
|
|
|
Refer to fire code review note item #19, discussed knox box installation and remainder of issues for final.
|
BLD-Final | 4/29/2010 | 4/29/2010 | 4/29/2010 | P | NR |
Tony Young
|
|
|
Herb Phone #: ###-####,, correction posted,, need trades,, etc,, on site walk through
|
BLD-Wall cover | 3/30/2010 | 3/30/2010 | 3/30/2010 | P | PASS |
Tony Young
|
|
|
herb Phone #: ###-####,, ceiling grid ok
|
BLD-Framing/Rough-in | 2/22/2010 | 2/23/2010 | 2/23/2010 | A | FAIL |
Tony Young
|
|
|
Ceiling grid inspection please-Herb Phone #: ###-####,, need trades signed off for above ceiling,, on site walk through,, should be ok on ceiling after trades
|
BLD-Energy code compliance | 1/11/2010 | 1/11/2010 | 1/11/2010 | P | PASS |
Tony Young
|
|
|
Herb Phone #: ###-####
|
BLD-Conference | 1/4/2010 | 1/5/2010 | 1/5/2010 | A | PART |
Tony Young
|
|
|
jerel,, 11am please,, frame conference w/ framer and contractor,, ok to insulate now,, still has a c/notice
|
BLD-Framing/Rough-in | 12/28/2009 | 12/29/2009 | 12/29/2009 | A | FAIL |
Tony Young
|
|
|
herb Phone #: ###-#### ,, 2 page c/n posted
|
BLD-Framing/Rough-in | 12/28/2009 | 12/28/2009 | 12/28/2009 | P | PART |
Tony Young
|
|
|
herb Phone #: ###-#### conf only,, need to get special inspection reports
|
BLD-Other | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Dave Hannah
|
|
|
foundation wall inspection// wants to pour at 2:30, has special inspection by MTI//Herb Brice Phone #: ###-#### ok to pour foundation
|
BLD-Footing | 8/12/2009 | 8/13/2009 | 8/13/2009 | A | PART |
Tony Young
|
|
|
Mark Phone #: ###-#### ok pending sp
|
BLD-Conference | 8/12/2009 | 8/12/2009 | 8/12/2009 | P | PASS |
Tony Young
|
|
|
Mark Phone #: ###-#### ftgs, wip,, will need a special inspection
|