DOC - Permit Finaled | | | 5/7/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 5/4/2009 | 5/4/2009 | 5/4/2009 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/4/2009 at 8:17:01 AM. Contact: ###-####.
|
FIRE-Final Inspection | 5/4/2009 | 5/4/2009 | 5/4/2009 | P | PASS |
Forrest France
|
|
|
Correction notice items verified for compliance, vanilla fire life safety passed.
|
FIRE-Final Inspection | 4/22/2009 | 4/22/2009 | 4/22/2009 | A | FAIL |
Forrest France
|
|
|
Existing office area at the vanilla TI is lacking sufficient fire sprinkler coverage and proper spacing per NFPA 13. Items include an office missing protection, overspacing at the entry lobby, two rooms with min./max. spacing issues. Fire sprinkler system modifications will require a separate permit- see project description and item #8 on the general notes on approved plan set.
|
BLD-Final | 4/22/2009 | 4/22/2009 | 4/22/2009 | A | PASS |
Jim Storey
|
|
|
Dan Phone #: ###-####
|