BLD-Final | 8/6/2009 | 8/6/2009 | 8/6/2009 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-#### C/C issued.
|
DOC - Permit Finaled | 8/6/2009 | 8/6/2009 | 8/6/2009 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/31/2009 | 8/3/2009 | 8/3/2009 | P | NR |
Jim Sly
|
|
|
Jim Phone #: ###-#### Need final affidait letter and all PSI test results on concrete for review.
|
BLD-Final | 7/31/2009 | 7/31/2009 | 7/31/2009 | A | NR |
Mike Jordan
|
|
|
Needs to provide final letter from special insp. agency. Noted all required sign offs ok. Final insp. ok.
|
FIRE-Final Inspection | 7/30/2009 | 7/31/2009 | 7/31/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 7/29/2009 | 7/30/2009 | 7/30/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 7/29/2009 | 7/30/2009 | 7/30/2009 | A | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Needs zoning and public works finals.
|
BLD-Framing/Rough-in | 5/15/2009 | 5/18/2009 | 5/18/2009 | A | PASS |
Jim Sly
|
|
|
Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 4/28/2009 | 4/29/2009 | 4/29/2009 | A | PART |
Dave Hannah
|
|
|
rick - visual of ceiling Phone #: ###-#### trusses ok ok to hang lid
|
BLD-Other | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PART |
Jim Sly
|
|
|
Rick- sheer wall Phone #: ###-#### S. and W. walls OK for hold down placement and attachment.
|
BLD-Conference | 3/26/2009 | 3/26/2009 | 3/27/2009 | P | CANC |
Jim Sly
|
|
|
|
BLD-Other | 3/24/2009 | 3/24/2009 | 3/24/2009 | P | PASS |
Jim Sly
|
|
|
Rick- stem wall Phone #: ###-####......OK
|
BLD-Footing | 3/19/2009 | 3/20/2009 | 3/20/2009 | A | PASS |
Jim Sly
|
|
|
rick Phone #: ###-#### Design 2500 PSI no special insp. req.
|