Permit Information
Permit NumberBLD09-00227
StatusFinaled
Name EKC INC
Site Address 301 N 29TH ST
Project NameWhittier Elementary
Customer Number 
ePlanReviewNo
Description
**(Re-roof & structural upgrades-)** For improvements to Whittier Elementary School. Work to include the removal of the existing roofing materials and roof sheeting and installing new roof sheeting and roofing. Some existing windows will be removed and replaced and two sun control devices will be installed. Structural upgrades will also be be performed by tying the roof and second floor diaphrams to the exterior walls. All work to be done per the approved plans and the attached engineering. Special inspections are required per the special inspection start up form. DEFERRED SUBMITTALS INCLUDING ENGINEERING AND MANUFACTURER'S SPECIFICATIONS SHALL BE PROVIDED AND APPROVED BY THE BUILDING DEPARTMENT PRIOR TO THE INSTALLATION OF THE SUN CONTROL DEVICES.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/4/20099/4/20099/4/2009PPASS
DetailsDave Hannah
Joe Phone #: ###-####
DOC - Permit Finaled9/4/20099/4/20099/4/2009PPASS
DetailsDave Hannah
BLD-Final8/28/20098/28/20098/28/2009PPART
DetailsDave Hannah
Joe Phone #: ###-#### ok but I need letter from mti
BLD-Final8/27/20098/28/20098/28/2009ACANC
DetailsDave Hannah
Joe Phone #: ###-####
BLD-Final8/5/20098/6/20098/6/2009ANR
DetailsDave Hannah
joe Phone #: ###-#### rained out
BLD-Framing/Rough-in7/30/20097/31/20097/31/2009APART
DetailsTony Young
Joe Phone #: ###-####
seismic ties and strapping,, wall ok in mobile unit pending elec r/in,, all as noted on plans
BLD-Other7/28/20097/28/20097/28/2009PPASS
DetailsTom Arcoraci
wip ok
BLD-Final7/28/20097/28/20097/28/2009PNR
DetailsTom Arcoraci
joe - 1 if possible please Phone #: ###-####
BLD-Framing/Rough-in7/24/20097/24/20097/24/2009PPASS
DetailsDave Hannah
Joe Phone #: ###-#### ok per David Hannah to change inspection for today. this is for the rest of area 5 ok to cover
BLD-Framing/Rough-in7/23/20097/23/20097/23/2009PPART
DetailsDave Hannah
Joe-around 2 if possible Phone #: ###-#### north half of east side of sec 5 ok to cover
BLD-Framing/Rough-in7/21/20097/22/20097/22/2009APART
DetailsDave Hannah
joe - 9:00 please Phone #: ###-#### ok to cover roof area 9
BLD-Framing/Rough-in7/15/20097/16/20097/16/2009APART
DetailsDave Hannah
for north and south ends of the building roof area #5//Joe ###-####//request 8am ok to cover
BLD-Framing/Rough-in7/13/20097/14/20097/15/2009APART
DetailsDave Hannah
joe Phone #: ###-#### north end of top roof ok to cover
BLD-Framing/Rough-in7/10/20097/10/20097/14/2009PPART
DetailsDave Hannah
Joe around 1 is possible Phone #: ###-#### okto cover east side of main roof
BLD-Framing/Rough-in7/1/20097/1/20097/2/2009PPART
DetailsDave Hannah
joe - as soon as possible Phone #: ###-#### roof area 2 ok to cover
BLD-Framing/Rough-in6/24/20096/25/20096/25/2009APART
DetailsDave Hannah
joe -8:00 if possible, please Phone #: ###-#### roof areas 1 and 3 \seismic connections ok ok to insulate and sheet