BLD-Final | 9/4/2009 | 9/4/2009 | 9/4/2009 | P | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-####
|
DOC - Permit Finaled | 9/4/2009 | 9/4/2009 | 9/4/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/28/2009 | 8/28/2009 | 8/28/2009 | P | PART |
Dave Hannah
|
|
|
Joe Phone #: ###-#### ok but I need letter from mti
|
BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | CANC |
Dave Hannah
|
|
|
Joe Phone #: ###-####
|
BLD-Final | 8/5/2009 | 8/6/2009 | 8/6/2009 | A | NR |
Dave Hannah
|
|
|
joe Phone #: ###-#### rained out
|
BLD-Framing/Rough-in | 7/30/2009 | 7/31/2009 | 7/31/2009 | A | PART |
Tony Young
|
|
|
Joe Phone #: ###-#### seismic ties and strapping,, wall ok in mobile unit pending elec r/in,, all as noted on plans
|
BLD-Other | 7/28/2009 | 7/28/2009 | 7/28/2009 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Final | 7/28/2009 | 7/28/2009 | 7/28/2009 | P | NR |
Tom Arcoraci
|
|
|
joe - 1 if possible please Phone #: ###-####
|
BLD-Framing/Rough-in | 7/24/2009 | 7/24/2009 | 7/24/2009 | P | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-#### ok per David Hannah to change inspection for today. this is for the rest of area 5 ok to cover
|
BLD-Framing/Rough-in | 7/23/2009 | 7/23/2009 | 7/23/2009 | P | PART |
Dave Hannah
|
|
|
Joe-around 2 if possible Phone #: ###-#### north half of east side of sec 5 ok to cover
|
BLD-Framing/Rough-in | 7/21/2009 | 7/22/2009 | 7/22/2009 | A | PART |
Dave Hannah
|
|
|
joe - 9:00 please Phone #: ###-#### ok to cover roof area 9
|
BLD-Framing/Rough-in | 7/15/2009 | 7/16/2009 | 7/16/2009 | A | PART |
Dave Hannah
|
|
|
for north and south ends of the building roof area #5//Joe ###-####//request 8am ok to cover
|
BLD-Framing/Rough-in | 7/13/2009 | 7/14/2009 | 7/15/2009 | A | PART |
Dave Hannah
|
|
|
joe Phone #: ###-#### north end of top roof ok to cover
|
BLD-Framing/Rough-in | 7/10/2009 | 7/10/2009 | 7/14/2009 | P | PART |
Dave Hannah
|
|
|
Joe around 1 is possible Phone #: ###-#### okto cover east side of main roof
|
BLD-Framing/Rough-in | 7/1/2009 | 7/1/2009 | 7/2/2009 | P | PART |
Dave Hannah
|
|
|
joe - as soon as possible Phone #: ###-#### roof area 2 ok to cover
|
BLD-Framing/Rough-in | 6/24/2009 | 6/25/2009 | 6/25/2009 | A | PART |
Dave Hannah
|
|
|
joe -8:00 if possible, please Phone #: ###-#### roof areas 1 and 3 \seismic connections ok ok to insulate and sheet
|